| 1 |
2022 |
Belanja Makanan dan Minuman Kegiatan Pelatihan dan Sertifikasi Tenaga Ahli (Pelatihan 1) |
51.477.600,00 |
100 |
2022-07-18 |
2022-07-23 |
| 2 |
2022 |
Pekerjaan Pengadaan Bahan AC-BC dan Aspal Emulsi |
184.140.000,00 |
100 |
2022-02-08 |
2022-02-15 |
| 3 |
2022 |
Pekerjaan Pengadaan Bahan Bakar Minyak (BBM) Solar |
167.313.000,00 |
100 |
2022-01-27 |
2022-01-31 |
| 4 |
2022 |
Pekerjaan Pengadaan Bahan Material Agregat Kelas B untuk Fungsional Jalan |
199.448.000,00 |
100 |
2022-02-18 |
2022-02-24 |
| 5 |
2022 |
Pekerjaan Pengadaan Bahan Material Agregat Kelas A untuk Fungsional Jalan |
199.783.000,00 |
100 |
2022-02-03 |
2022-02-09 |
| 6 |
2022 |
Pekerjaan Pengadaan Bahan Bakar Minyak (BBM) Solar |
172.899.000,00 |
100 |
2022-02-21 |
2022-02-25 |
| 7 |
2022 |
Pekerjaan Pengadaan Bahan Material Bahu Jalan |
194.839.000,00 |
100 |
2022-02-03 |
2022-02-17 |
| 8 |
2022 |
Pekerjaan Pengadaan Bahan Material Bahu Jalan |
194.834.000,00 |
100 |
2022-02-21 |
2022-03-07 |
| 9 |
2022 |
Pekerjaan Pengadaan Bahan Bakar Minyak (BBM) Solar |
192.379.000,00 |
100 |
2022-03-24 |
2022-03-28 |
| 10 |
2022 |
Pekerjaan Pengadaan Bahan Material Patching/Penambalan Jalan |
197.932.000,00 |
100 |
2022-03-01 |
2022-03-25 |
| 11 |
2022 |
Pekerjaan Pengadaan Bahan Material Bahu Jalan |
192.209.000,00 |
100 |
2022-03-10 |
2022-03-24 |
| 12 |
2022 |
Pekerjaan Pengadaan Bahan Material Patching/Penambalan Jalan |
198.610.000,00 |
100 |
2022-03-21 |
2022-03-24 |
| 13 |
2022 |
Pekerjaan Pengadaan Bahan AC-BC dan Aspal Emulsi |
184.140.000,00 |
100 |
2022-02-08 |
2022-02-15 |
| 14 |
2022 |
Pekerjaan Pengadaan Bahan Agregat Klas A, AC-BC, dan Aspal Emulsi |
197.956.000,00 |
100 |
2022-01-12 |
2022-01-19 |
| 15 |
2022 |
Pekerjaan Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
195.216.000,00 |
100 |
2022-01-18 |
2022-01-25 |
| 16 |
2022 |
Pengadaan Bahan Agregat Klas B |
190.754.000,00 |
100 |
2022-10-20 |
2022-01-27 |
| 17 |
2022 |
Pekerjaan Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
196.755.000,00 |
100 |
2022-01-12 |
2022-01-19 |
| 18 |
2022 |
Pengadaan Bahan Agregat Klas B |
187.530.000,00 |
100 |
2022-02-14 |
2022-02-21 |
| 19 |
2022 |
Pengadaan Bahan Timbunan Pilihan Dari Sumber Galian |
196.803.000,00 |
100 |
2022-02-10 |
2022-02-17 |
| 20 |
2022 |
Pengadaan Bahan Agregat Klas B |
187.530.000,00 |
100 |
2022-02-14 |
2022-02-21 |
| 21 |
2022 |
Pengadaan Bahan Timbunan Pilihan Dari Sumber Galian |
196.230.000,00 |
100 |
2022-01-31 |
2022-02-07 |
| 22 |
2022 |
Pengadaan Bahan Aggregat Klas B |
196.522.000,00 |
100 |
2022-02-17 |
2022-02-24 |
| 23 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
198.988.000,00 |
100 |
2022-01-17 |
2022-01-24 |
| 24 |
2022 |
Pengadaan Bahan Agregat Klas A, AC-BC dan Aspal Emulsi |
199.467.000,00 |
100 |
2022-01-31 |
2022-02-07 |
| 25 |
2022 |
Pengadaan Bahan Bronjong Dengan Kawat Dilapisi |
199.351.000,00 |
100 |
2022-03-01 |
2022-03-08 |
| 26 |
2022 |
Pekerjaan Pengadaan Bahan AC-BC, dan Aspal Emulsi |
194.306.000,00 |
100 |
2022-03-21 |
2022-03-28 |
| 27 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
199.331.000,00 |
100 |
2022-03-21 |
2022-03-28 |
| 28 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
199.093.000,00 |
100 |
2022-03-04 |
2022-03-11 |
| 29 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
199.438.000,00 |
100 |
2022-03-15 |
2022-03-22 |
| 30 |
2022 |
Pekerjaan Pengadaan Bahan Bronjong dengan Kawat Dilapisi Galvanis |
196.024.000,00 |
100 |
2022-04-12 |
2022-04-19 |
| 31 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
197.853.000,00 |
100 |
2022-04-12 |
2022-04-19 |
| 32 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
196.413.000,00 |
100 |
2022-04-14 |
2022-04-21 |
| 33 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
199.688.000,00 |
|
2022-04-18 |
2022-04-25 |
| 34 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
198.594.000,00 |
100 |
2022-04-06 |
2022-04-13 |
| 35 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
198.777.000,00 |
100 |
2022-04-06 |
2022-04-13 |
| 36 |
2022 |
Pekerjaan Pengadaan Bahan AC-BC dan Aspal Emulsi |
197.587.000,00 |
100 |
2022-04-14 |
2022-04-21 |
| 37 |
2022 |
Pekerjaan Pengadaan Bahan Agregat Klas A |
198.657.000,00 |
100 |
2022-04-12 |
2022-04-19 |
| 38 |
2022 |
Pengadaan Bahan Bakar Minyak Di Lingkungan UPT Jalan Dan Jembatan WIilayah V |
172.899.700,00 |
100 |
2022-02-15 |
2022-02-22 |
| 39 |
2022 |
Pengadaan Bahan Agregat Klas B |
197.646.000,00 |
100 |
2022-04-18 |
2022-04-25 |
| 40 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
198.709.000,00 |
100 |
2022-05-10 |
2022-05-17 |
| 41 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
197.804.000,00 |
100 |
2022-05-10 |
2022-05-17 |
| 42 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-250 |
197.397.000,00 |
100 |
2022-05-10 |
2022-05-17 |
| 43 |
2022 |
Pengadaan Bahan Kayu Klas I |
110.562.000,00 |
100 |
2022-05-23 |
2022-05-30 |
| 44 |
2022 |
Pengadaan Bahan Kayu Klas I |
150.807.000,00 |
100 |
2022-05-18 |
2022-05-25 |
| 45 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-250 |
199.715.000,00 |
100 |
2022-05-18 |
2022-05-25 |
| 46 |
2022 |
Pekerjaan Pengadaan Bahan Bronjong dengan Kawat Dilapisi Galvanis |
199.777.000,00 |
100 |
2022-05-18 |
2022-05-25 |
| 47 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
197.226.000,00 |
100 |
2022-05-23 |
2022-05-30 |
| 48 |
2022 |
Pekerjaan Pengadaan Bahan Material Saluran/Drainase Jalan |
199.529.000,00 |
100 |
2022-03-09 |
2022-04-01 |
| 49 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
197.147.000,00 |
100 |
2022-05-23 |
2022-05-30 |
| 50 |
2022 |
Pekerjaan Pengadaan Bahan Material Bahu Jalan |
194.837.000,00 |
100 |
2022-03-28 |
2022-04-11 |
| 51 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-250 |
196.638.000,00 |
100 |
2022-05-13 |
2022-05-20 |
| 52 |
2022 |
Pengadaan Bahan Agregat Klas B |
198.962.000,00 |
100 |
2022-05-13 |
2022-05-20 |
| 53 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
198.903.000,00 |
100 |
2022-05-18 |
2022-05-25 |
| 54 |
2022 |
Pekerjaan Pengadaan Bahan Material Patching/Penambalan Jalan |
198.136.000,00 |
100 |
2022-03-28 |
2022-04-21 |
| 55 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-250 |
197.852.000,00 |
100 |
2022-05-23 |
2022-05-30 |
| 56 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
198.304.000,00 |
100 |
2022-05-18 |
2022-05-25 |
| 57 |
2022 |
Pekerjaan Pengadaan Bahan Bakar Minyak (BBM) Solar |
189.916.000,00 |
100 |
2022-04-25 |
2022-04-29 |
| 58 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
198.127.000,00 |
100 |
2022-06-06 |
2022-06-13 |
| 59 |
2022 |
Pengadaan Bahan Agregat Klas B |
199.869.000,00 |
100 |
2022-06-13 |
2022-06-20 |
| 60 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
198.548.000,00 |
100 |
2022-06-02 |
2022-06-09 |
| 61 |
2022 |
Pekerjaan Pengadaan Bahan Material Bahu Jalan |
198.000.000,00 |
100 |
2022-04-14 |
2022-04-28 |
| 62 |
2022 |
Pekerjaan Pengadaan Bahan Bronjong dengan Kawat Dilapisi Galvanis |
198.731.000,00 |
100 |
2022-06-06 |
2022-06-13 |
| 63 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
199.656.000,00 |
100 |
2022-06-02 |
2022-06-09 |
| 64 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
198.994.000,00 |
100 |
2022-06-13 |
2022-06-20 |
| 65 |
2022 |
Pekerjaan Pengadaan Bahan Bakar Minyak (BBM) Solar |
188.946.000,00 |
100 |
2022-05-10 |
2022-05-13 |
| 66 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
198.456.000,00 |
100 |
2022-06-02 |
2022-06-09 |
| 67 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
198.321.000,00 |
100 |
2022-06-13 |
2022-06-20 |
| 68 |
2022 |
Pekerjaan Pengadaan Bahan Material Agregat Kelas A untuk Fungsional Jalan |
196.579.000,00 |
100 |
2022-05-12 |
2022-05-18 |
| 69 |
2022 |
Pengadaan Bahan Baja Tulangan U-24 Dan Beton K-175, PRECAST 80X80, Cerocok Kayu DanTimbunan Pilihan |
119.223.000,00 |
100 |
2022-06-16 |
2022-06-23 |
| 70 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
197.651.000,00 |
100 |
2022-06-16 |
2022-06-23 |
| 71 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
197.919.000,00 |
100 |
2022-06-16 |
2022-06-23 |
| 72 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
198.950.000,00 |
100 |
2022-06-16 |
2022-06-23 |
| 73 |
2022 |
Pekerjaan Pengadaan Bahan Material Agregat Kelas B untuk Fungsional Jalan |
196.635.000,00 |
100 |
2022-05-17 |
2022-05-20 |
| 74 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
198.816.000,00 |
100 |
2022-06-16 |
2022-06-23 |
| 75 |
2022 |
Penhadaan Bahan Bakar Minyak Di Lingkungan UPT Jalan Dan Jembatan Wilayah V |
175.593.600,00 |
100 |
2022-06-02 |
2022-06-09 |
| 76 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
177.169.000,00 |
100 |
2022-07-18 |
2022-07-26 |
| 77 |
2022 |
Pekerjaan Pengadaan Bahan Material Bronjong |
190.442.000,00 |
100 |
2022-05-11 |
2022-05-20 |
| 78 |
2022 |
Pengadaan Bahan Agregat Klas A |
198.570.000,00 |
100 |
2022-07-05 |
2022-07-12 |
| 79 |
2022 |
Pengadaan Bahan Timbunan Pilihan dari Sumber Galian |
184.850.000,00 |
100 |
2022-07-05 |
2022-07-12 |
| 80 |
2022 |
Pekerjaan Pengadaan Bahan Bakar Minyak (BBM) Solar |
196.610.000,00 |
100 |
2022-05-30 |
2022-06-02 |
| 81 |
2022 |
Pengadaan Bahan Baja Tulangan U24 Dan Beton K-175 |
193.439.000,00 |
100 |
2022-07-18 |
2022-07-25 |
| 82 |
2022 |
Pengadaan Bahan Baja Tulangan U-24, BetonK-175, Precast 1.5 X 1 X 1 M, Cerocok Kayu, Timbunan Biasa Dan Agregat Klas B |
197.451.000,00 |
100 |
2022-07-18 |
2022-07-25 |
| 83 |
2022 |
Pekerjaan Pengadaan Bahan Material Patching/Penambalan Jalan |
198.637.000,00 |
100 |
2022-05-30 |
2022-06-03 |
| 84 |
2022 |
Pengadaan Bahan Ac-Bc (Hotmix) Dan Aspal Emulsi |
190.428.000,00 |
100 |
2022-07-30 |
2022-07-07 |
| 85 |
2022 |
Pengadaan Bahan Agregat Klas B |
194.896.000,00 |
100 |
2022-06-30 |
2022-07-07 |
| 86 |
2022 |
Pengadaan Bahan Timbunan Pilihan Dari Sumber Galian |
148.549.000,00 |
100 |
2022-07-05 |
2022-07-12 |
| 87 |
2022 |
Pengadaan Bahan Agregat Klas B |
197.979.000,00 |
100 |
2022-07-18 |
2022-07-25 |
| 88 |
2022 |
Pengadaan Bahan Agregat Klas B |
198.995.000,00 |
100 |
2022-08-15 |
2022-08-22 |
| 89 |
2022 |
Pengadaan Bahan Ac-Bc Dan Aspal Emulsi |
168.768.000,00 |
100 |
2022-08-08 |
2022-08-15 |
| 90 |
2022 |
Pengadaan Bahan Precast 0.8 X 0.8 x 1 M, Precast 1 X 1 x 1 M Dan Agregat Klas B |
199.438.000,00 |
100 |
2022-08-15 |
2022-08-22 |
| 91 |
2022 |
PENGADAAN BAHAN BAKAR MINYAK DI LINGKUNGAN UPT JALAN DAN JEMBATAN WILAYAH V |
129.461.250,00 |
100 |
2022-08-15 |
2022-08-22 |
| 92 |
2022 |
PENGADAAN BAHAN BAKAR MINYAK DI LINGKUNGAN UPT JALAN DAN JEMBATAN WILAYAH V |
129.461.250,00 |
100 |
2022-08-15 |
2022-08-22 |
| 93 |
2022 |
Pengadaan Bahan AC-BC dan Aspal Emulsi |
197.010.000,00 |
100 |
2022-09-19 |
2022-09-26 |
| 94 |
2022 |
Pengadaan Bahan AC-BC dan Aspal Emulsi |
198.687.000,00 |
100 |
2022-09-19 |
2022-09-26 |
| 95 |
2022 |
Belanja Alat/Bahan untuk Kegiatan Kantor -Alat Tulis Kantor -Kertas DAN |
101.194.954,00 |
100 |
2022-03-29 |
2022-04-12 |
| 96 |
2022 |
Belanja Barang Pakai Habis Laboratorium |
117.587.073,00 |
100 |
2022-04-07 |
2022-04-21 |
| 97 |
2022 |
Belanja Modal Mebel |
175.274.550,00 |
100 |
2022-04-21 |
2022-04-26 |
| 98 |
2022 |
Belanja Pemeliharaan Alat Laboratorium -Unit Alat Laboratorium-Alat Laboratorium Lainnya-Perbaikan/Pemeliharaan |
88.064.149,00 |
100 |
2022-08-18 |
2022-09-01 |
| 99 |
2022 |
Pekerjaan Pengadaan Bahan Material Bahu Jalan |
198.000.000,00 |
100 |
2022-05-27 |
2022-06-10 |
| 100 |
2022 |
Pekerjaan Pengadaan Bahan Material Agregat Kelas A untuk Fungsional Jalan |
198.307.000,00 |
100 |
2022-06-02 |
2022-06-08 |
| 101 |
2022 |
Pekerjaan Pengadaan Bahan Material Agregat Kelas B untuk Fungsional Jalan |
196.675.000,00 |
100 |
2022-06-07 |
2022-06-10 |
| 102 |
2022 |
DED Pengaman Pantai di Pulau Rangsang Kabupaten Kepulauan Meranti |
293.539.500,00 |
100 |
2022-06-27 |
2022-09-24 |
| 103 |
2022 |
SID Normalisasi Sungai Reteh Wilayah Sungai (WS) Reteh di Kab. Indragiri Hilir |
99.836.000,00 |
100 |
2022-04-04 |
2022-05-18 |
| 104 |
2022 |
Pembangunan Pengaman Pantai Ketapang Pulau Rupat Kab. Bengkalis |
461.303.752,00 |
20 |
2022-07-13 |
2022-11-09 |
| 105 |
2022 |
Pembangunan Pengaman Pantai Sekodi Kab. Bengkalis |
932.488.469,00 |
20 |
2022-06-24 |
2022-12-20 |
| 106 |
2022 |
Pengawasan Pembangunan Pengaman Pantai Sekodi Kab. Bengkalis dan Pembangunan Pengaman Pantai Ketapang Pulau Rupat Kab. Bengkalis |
99.900.000,00 |
20 |
2022-07-05 |
2022-12-20 |
| 107 |
2022 |
Simple Design Pembangunan Pengaman Pantai Ketapang Pulau Rupat Kab. Bengkalis |
47.905.000,00 |
100 |
2022-04-04 |
2022-05-18 |
| 108 |
2022 |
SID Normalisasi Sungai Batang Kec. Sungai Batang |
99.869.000,00 |
100 |
2022-04-04 |
2022-05-18 |
| 109 |
2022 |
Pengawasan Normalisasi Sungai Batang Kec. Sungai Batang |
49.994.400,00 |
15 |
2022-07-29 |
2022-12-10 |
| 110 |
2022 |
Pengawasan Pemeliharaan Sungai di Wilayah Sungai (WS) Bengkalis - Meranti di Kabupaten Bengkalis |
99.984.500,00 |
100 |
2022-04-01 |
2022-07-09 |
| 111 |
2022 |
Pengawasan Pemeliharaan Sungai di Wilayah Sungai (WS) Bengkalis - Meranti di Kabupaten Kepulauan Meranti |
29.790.735,00 |
100 |
2022-04-04 |
2022-07-12 |
| 112 |
2022 |
Pengawasan Pemeliharaan Sungai di Wilayah Sungai (WS) Reteh di Kabupaten Indragiri Hilir |
99.976.250,00 |
100 |
2022-04-01 |
2022-07-09 |
| 113 |
2022 |
Pengawasan Pemeliharaan Sungai di Wilayah Sungai (WS) Reteh di Kabupaten Indragiri Hulu |
99.992.750,00 |
100 |
2022-04-01 |
2022-07-09 |
| 114 |
2022 |
Normalisasi Sungai Batang Kec. Sungai Batang |
572.783.093,00 |
15 |
2022-07-29 |
2022-12-10 |
| 115 |
2022 |
Normalisasi Sungai Bima Sakti I RT 02 RW 04 Kel. Batu Panjang Kec. Rupat |
169.992.427,00 |
100 |
2022-04-01 |
2022-07-09 |
| 116 |
2022 |
Normalisasi Sungai Deluk Desa Deluk Kec. Bantan |
179.987.385,00 |
100 |
2022-04-01 |
2022-07-09 |
| 117 |
2022 |
Normalisasi Sungai di Desa Belimbing Kec. Batang Gansal |
184.653.370,00 |
100 |
2022-04-01 |
2022-07-09 |
| 118 |
2022 |
Normalisasi Sungai di Desa Penyaguan Kec. Batang Gansal |
184.679.990,00 |
100 |
2022-04-01 |
2022-07-09 |
| 119 |
2022 |
Normalisasi Sungai di Desa Ringin Kec. Batang Gansal |
184.659.750,00 |
100 |
2022-04-01 |
2022-07-09 |
| 120 |
2022 |
Normalisasi Sungai di Desa Sungai Akar Kec. Batang Gansal |
184.663.490,00 |
100 |
2022-04-01 |
2022-07-09 |
| 121 |
2022 |
Normalisasi Sungai di Desa Talang Lakat Kec. Batang Gansal |
184.678.670,00 |
100 |
2022-04-01 |
2022-07-09 |
| 122 |
2022 |
Normalisasi Sungai Ikan RT 16 RW 03 Dusun 2 Sri Makmur Desa Sungai Cingam Kec. Rupat |
179.952.393,00 |
100 |
2022-04-01 |
2022-07-09 |
| 123 |
2022 |
Normalisasi Sungai Kampung Baru RT 16 RW 05 Kel. Terkul Kec. Rupat |
169.965.559,00 |
100 |
2022-04-01 |
2022-07-09 |
| 124 |
2022 |
Pekerjaan Pengadaan Bahan Material Agregat Kelas B untuk Fungsional Jalan |
198.407.000,00 |
100 |
2022-06-14 |
2022-06-17 |
| 125 |
2022 |
Normalisasi Sungai Meskom Desa Simpang Ayam Kec. Bengkalis |
179.995.415,00 |
100 |
2022-04-01 |
2022-07-09 |
| 126 |
2022 |
Pekerjaan Pengadaan Bahan Bakar Minyak (BBM) Solar |
199.006.000,00 |
100 |
2022-06-13 |
2022-06-15 |
| 127 |
2022 |
Normalisasi Sungai Parit Imam Syamsudin laut RT 11 RW 04 Kel. Pergam Kec. Rupat |
169.977.959,00 |
100 |
2022-04-01 |
2022-07-09 |
| 128 |
2022 |
Pekerjaan Pengadaan Bahan Material Bronjong |
199.367.000,00 |
100 |
2022-06-13 |
2022-06-22 |
| 129 |
2022 |
Normalisasi Sungai Rampang Kel. Tanjung Kapal Kec. Rupat |
179.982.325,00 |
100 |
2022-04-01 |
2022-07-09 |
| 130 |
2022 |
Pekerjaan Pengadaan Bahan Material Agregat Kelas B untuk Fungsional Jalan |
196.680.000,00 |
100 |
2022-06-21 |
2022-06-24 |
| 131 |
2022 |
Pekerjaan Pengadaan Bahan Material Bahu Jalan |
197.985.000,00 |
100 |
2022-06-13 |
2022-06-27 |
| 132 |
2022 |
Normalisasi Sungai Reteh Kec. Keritang Kab. Indragiri Hilir |
1.137.999.195,00 |
15 |
2022-07-26 |
2022-12-07 |
| 133 |
2022 |
Normalisasi Sungai Saka Kanan Dusun Kampung Aman Desa Darul Aman Kec. Rupat |
179.968.013,00 |
100 |
2022-04-01 |
2022-07-09 |
| 134 |
2022 |
Normalisasi Sungai Sako Desa Teluk Latak Kec. Bengkalis |
179.973.525,00 |
100 |
2022-04-01 |
2022-07-09 |
| 135 |
2022 |
Normalisasi Sungai Sejahtera Desa Sri Tanjung Kec. Rupat |
169.992.240,00 |
100 |
2022-04-01 |
2022-07-09 |
| 136 |
2022 |
Normalisasi Sungai Sekadar Desa Makruh Kec. Rupat |
179.986.175,00 |
100 |
2022-04-01 |
2022-07-09 |
| 137 |
2022 |
Pekerjaan Pengadaan Bahan Bakar Minyak (BBM) Solar |
199.473.000,00 |
100 |
2022-06-29 |
2022-07-01 |
| 138 |
2022 |
Normalisasi Sungai Seliau Desa Ketamputih Kec. Bengkalis |
179.995.415,00 |
100 |
2022-04-01 |
2022-07-09 |
| 139 |
2022 |
Normalisasi Sungai Yap Dusun 1 RT 01 RW 01 Desa Pangkalan Nyirih Kec. Rupat |
179.967.573,00 |
100 |
2022-04-01 |
2022-07-09 |
| 140 |
2022 |
Pemeliharaan Parit 20 Dusun Sido Rukun Desa Pulau Kecil Kec. Reteh |
184.676.140,00 |
100 |
2022-04-01 |
2022-07-09 |
| 141 |
2022 |
Pemeliharaan Parit 6 Sungai Nau RT 6 RW 5 Dusun Sungai Nau Jaya Desa TelukKelasa Kec. Keritang Kab. Indragiri Hilir |
184.659.475,00 |
100 |
2022-04-01 |
2022-07-09 |
| 142 |
2022 |
Pemeliharaan Parit Bandung Dusun Kelapa Desa Pasar Kembang Kec. Keritang |
184.684.940,00 |
100 |
2022-04-01 |
2022-07-09 |
| 143 |
2022 |
Pemeliharaan Parit Bunga Padi Dusun Baru Desa Pengalihan Kec. Keritang |
184.650.840,00 |
100 |
2022-04-01 |
2022-07-09 |
| 144 |
2022 |
Pemeliharaan Parit Dungun Desa Sanglar Kec. Reteh |
184.668.550,00 |
100 |
2022-04-01 |
2022-07-09 |
| 145 |
2022 |
Pemeliharaan Parit Jahari Desa Pebenaan Kec.Keritang Kab. Indragiri Hilir |
184.669.760,00 |
100 |
2022-04-01 |
2022-07-09 |
| 146 |
2022 |
Pemeliharaan Parit Jawa Dusun Harapan Jaya Desa Seberang Pulau Kijang Kec. Reteh Kab. Indragiri Hilir |
184.672.290,00 |
100 |
2022-04-01 |
2021-07-09 |
| 147 |
2022 |
Pemeliharaan Parit Jaya Putra, Desa Nyiur Permai, Kec. Keritang |
184.682.245,00 |
100 |
2022-04-01 |
2022-07-09 |
| 148 |
2022 |
Pemeliharaan Parit Mawek Desa Kembang Mekar Sari Kec. Keritang |
184.650.675,00 |
100 |
2022-04-01 |
2022-07-09 |
| 149 |
2022 |
Pemeliharaan Parit Lemang Besar Desa Kuala Lemang Kec. Keritang |
184.674.655,00 |
100 |
2022-04-11 |
2022-06-19 |
| 150 |
2022 |
Pemeliharaan Parit Pinang Desa Nusantara Jaya Kec. Keritang Kab. Indragiri Hilir |
184.658.430,00 |
100 |
2022-04-01 |
2022-07-09 |
| 151 |
2022 |
Pemeliharaan Parit Tani Maju RW 03 Desa Seberang Pembenaan |
184.672.290,00 |
100 |
2022-04-11 |
2022-07-09 |
| 152 |
2022 |
Pemeliharaan Parit Satu Tunas Muda RT 04 RW 03 Dusun Kuala Sei Akar Desa Sencalang Kec. Keritang Kab. Indragiri Hilir |
184.678.505,00 |
100 |
2022-04-01 |
2022-07-09 |
| 153 |
2022 |
Pemeliharaan Parit Sayang Dusun Semoga Jaya Desa Kuala Keritang Kec. Keritang |
184.684.940,00 |
100 |
2022-04-01 |
2022-07-09 |
| 154 |
2022 |
Pemeliharaan Parit Subulus Salam Dusun Hidayah Desa Pancur Kec. Keritang |
184.663.490,00 |
100 |
2022-12-01 |
2022-07-09 |