| 1 |
2024 |
PERENCANAAN PEMBANGUNAN SISTEM DRAINASE LINGKUNGAN KEC. BUKIT BATU |
14.877.330 |
SELESAI |
2024-04-04 |
2024-05-03 |
| 2 |
2024 |
PERENCANAAN NORMALISASI KECAMATAN MANDAU |
79.953.300 |
SELESAI |
2024-04-04 |
2024-05-03 |
| 3 |
2024 |
PERENCANAAN NORMALISASI KECAMATAN BUKIT BATU |
39.948.900 |
SELESAI |
2024-10-01 |
2024-10-30 |
| 4 |
2024 |
PENINGKATAN PAGAR RUMAH DINAS INSTANSI VERTIKAL JL. BANTAN DESA SENGGORO (KODIM 0303 BENGKALIS) |
199.700.000 |
SELESAI |
2024-11-19 |
2024-12-18 |
| 5 |
2024 |
PENINGKATAN JALAN PROTOKOL |
1.482.598.545 |
SELESAI |
2024-05-07 |
2024-09-03 |
| 6 |
2024 |
PENINGKATAN JL. UTAMA DESA DUSUN TALANG JONEH RT 02 RW 01 DESA SEBANGAR KEC. BATHIN SOLAPAN |
199.550.000 |
SELESAI |
2024-10-17 |
2025-12-15 |
| 7 |
2024 |
PENINGKATAN JALAN PANGKALAN NYIRIH - TITI AKAR (DBH SAWIT 2024) |
7.341.449.720 |
SELESAI |
2024-06-26 |
2024-09-23 |
| 8 |
2024 |
PENINGKATAN JALAN KAYU API |
7.838.819.960 |
SELESAI |
2024-06-10 |
2024-12-23 |
| 9 |
2024 |
PENINGKATAN JALAN TANJUNG KAPAL - DARUL AMAN |
9.878.844.022 |
SELESAI |
2024-04-26 |
2024-08-23 |
| 10 |
2024 |
PENINGKATAN JALAN POROS MENUJU DESA MAKERUH |
1.836.775.489 |
SELESAI |
2024-11-19 |
2024-12-18 |
| 11 |
2024 |
PENINGKATAN JALAN POROS KELURAHAN AIR JAMBAN |
494.422.268 |
SELESAI |
2024-06-26 |
2024-10-23 |
| 12 |
2024 |
PENINGKATAN JALAN PAMBANG - TELUK LANCAR (DAK) |
7.310.388.000 |
SELESAI |
2024-06-14 |
2024-11-10 |
| 13 |
2024 |
PENINGKATAN JALAN KETAMPUTIH - SEKODI (DBH SAWIT 2023) |
10.243.598.738 |
SELESAI |
2024-06-19 |
2024-12-15 |
| 14 |
2024 |
PENINGKATAN JALAN KETAM PUTIH - SEKODI (DBH SAWIT 2024) |
8.208.113.503 |
SELESAI |
2024-06-19 |
2024-12-15 |
| 15 |
2024 |
PENINGKATAN JALAN GAJAH HAN PINGGIR |
8.818.000.000 |
SELESAI |
2024-06-10 |
2024-11-06 |
| 16 |
2024 |
PENINGKATAN JALAN BERINGIN |
4.899.606.640 |
SELESAI |
2024-05-13 |
2024-12-08 |
| 17 |
2024 |
PENINGKATAN JALAN BUKIT ABBAS KECAMATAN BATHIN SOLAPAN |
1.937.000.000 |
SELESAI |
2024-05-15 |
2024-09-11 |
| 18 |
2024 |
PENGAWASAN PENINGKATAN JALAN POROS REGULER KECAMATAN RUPAT |
198.917.550 |
SELESAI |
2024-04-26 |
2024-08-23 |
| 19 |
2024 |
PENGAWASAN PENINGKATAN JALAN POROS STRATEGIS KECAMATAN PINGGIR A |
296.721.870 |
SELESAI |
2024-06-10 |
2024-11-06 |
| 20 |
2024 |
PENGAWASAN PENINGKATAN JALAN POROS REGULER KECAMATAN MANDAU |
148.612.394 |
SELESAI |
2024-06-07 |
2024-10-04 |
| 21 |
2024 |
PENGAWASAN PENINGKATAN JALAN POROS REGULER KECAMATAN BATHIN SOLAPAN |
196.902.900 |
SELESAI |
2024-05-13 |
2024-09-09 |
| 22 |
2024 |
PENGAWASAN PENINGKATAN JALAN POROS REGULER KECAMATAN BUKIT BATU |
49.950.000 |
SELESAI |
2024-06-10 |
2024-10-07 |
| 23 |
2024 |
PENGAWASN PEMBANGUNAN TPA/TPST KEC. MANDAU KEC. BATHIN SOLAPAN |
84.915.000 |
SELESAI |
2024-10-01 |
2024-12-24 |
| 24 |
2024 |
PENGAWASN PEMBANGUNAN RUMAH SULUK BABUL IKSAN DESA API - API KEC. BANDAR LAKSAMANA |
84.870.600 |
SELESAI |
2024-05-16 |
2024-11-12 |
| 25 |
2024 |
PENGAWASAN PEMBANGUNAN JEMBATAN KECAMATAN MANDAU DAN KECAMATAN PINGGIR |
246.642.000 |
SELESAI |
2024-06-24 |
2024-11-20 |
| 26 |
2024 |
PENGAWASAN PEMBANGUNAN JEMBATAN KECAMATAN RUPAT DAN KECAMATAN RUPAT UTARA |
394.449.600 |
SELESAI |
2024-07-22 |
2024-12-18 |
| 27 |
2024 |
PENGAWASAN NORMALISASI KECAMATAN MANDAU |
44.921.700 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 28 |
2024 |
PEMBANGUNAN TPA/TPS KEC. MANDAU - KEC. BATHIN SOLAPAN |
1.260.972.041 |
SELESAI |
2024-09-26 |
2024-12-24 |
| 29 |
2024 |
PEMBANGUNAN BOX CULVERT JL. SUBRANTAS RT.003/RW.009 BALAI RAJA KEC.PINGGIR |
199.501.120 |
SELESAI |
2024-10-17 |
2024-12-15 |
| 30 |
2024 |
PEMBANGUNAN TURAP JL.KAMPUNG BARU RT 001 RW 002 DUSUN SRI WIDODO DESA KOTO RAJA KEC. SIAK KECIL KAB.BENGKALIS |
149.779.822 |
SELESAI |
2024-09-11 |
2024-12-09 |
| 31 |
2024 |
PEMBANGUNAN JEMBATAN RUAS JALAN BATU PANJANG-PANGKALAN NYIRIH |
8.977.431.468 |
SELESAI |
2024-07-24 |
2024-12-20 |
| 32 |
2024 |
PEMBANGUNAN PARIT BETON JALAN PURNA DUSUN SEMPURNA DESA ULU PULAU KECAMATAN BANTAN KAB.BENGKALIS |
149.567.072 |
SELESAI |
2024-09-11 |
2024-12-24 |
| 33 |
2024 |
NORMALISASI PARIT INDUK PERBATASAN BALAI RAJA DAN KEL. PEMATANG PUDU, KEC. MANDAU |
194.648.680 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 34 |
2024 |
NORMALISASI SUNGAI DESA BULUH MANIS KAB. BENGKALIS |
199.586.266 |
SELESAI |
2024-09-11 |
2024-11-09 |
| 35 |
2024 |
NORMALISASI PARIT JL. POROS DESA CINGAM MENUJU PANGKALAN NYIRIH KEC. RUPAT |
194.743.037 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 36 |
2024 |
NORMALISASI PARIT JL. DAMAI RT.001/RW.006 DUSUN BARU DESA MUNTAI BARAT KECAMATAN BANTAN KABUPATEN BENGKALIS |
194.622.604 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 37 |
2024 |
NORMALISASI PARIT JALAN AKASIA DUSUN II RT.001/RW.004 DESA KETAM PUTIH |
194.884.208 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 38 |
2024 |
NORMALISASI PARIT JALAN TAMBAK REJO DESA JANGKANG |
194.473.061 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 39 |
2024 |
NORMALISASI PARIT JALAN PINANG MERAH DUSUN BANTARAN RT.002/RW.001 DESA PEMATANG DUKU TIMUR |
194.863.458 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 40 |
2024 |
NORMALISASI PARIT JALAN AKI BAKI DUSUN II RT.004/RW.004 DESA KETAM PUTIH |
194.884.208 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 41 |
2024 |
NORMALISASI PARIT INDUK DESA SEBANGAR KEC. BATHIN SOLAPAN |
194.557.481 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 42 |
2024 |
NORMALISASI PARIT DUSUN SUKU ASLI DESA JANGKANG |
194.547.179 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 43 |
2024 |
LANJUTAN NORMALISASI PARIT JALAN SUKARAMAI MENUJU BANTAN RT 03 RW 02 DUSUN SUKARAMAI DESA PEMATANG DUKU KEC. BENGKALIS KAB. BENGKALIS |
199.763.025 |
SELESAI |
2024-09-11 |
2024-11-09 |
| 44 |
2024 |
NORMALISASI PARIT JL. POROS MENUJU DESA PARIT KEBUMEN KEC. RUPAT |
194.732.314 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 45 |
2024 |
PENGAWASAN PEMBANGUNAN BANGUNAN PERKUATAN TEBING KECAMATAN BUKIT BATU |
49.672.500 |
SELESAI |
2024-04-30 |
2025-08-27 |
| 46 |
2024 |
FEASIBILITY STUDY AIR LIMBAH DOMESTIK MANDAU - PINGGIR |
498.057.000 |
SELESAI |
2024-09-12 |
2024-12-27 |
| 47 |
2024 |
NORMALISASI PARIT JALAN ANTARA RT.06/RW.03 DUSUN PASIR PUTIH KEC. RUPAT UTARA |
194.653.307 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 48 |
2024 |
NORMALISASI TALI AIR SUNGAI BANTAN MENUJU KUALA JANGKANG DI RW 003 DUSUN LEBAI WAHID DESA BANTAN TUA KECAMATAN BANTAN KAB. BENGKALIS |
199.754.995 |
SELESAI |
2024-09-11 |
2024-11-09 |
| 49 |
2024 |
NORMALISASI PARIT HARAPAN 1 RT.12 RW. 03 DUSUN 3 DESA PENEBAL |
179.897.700 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 50 |
2024 |
NORMALISASI PARIT JALAN PERKEBUNAN DUSUN SENA RT 4 RW 8 DESA SUNGAI LINAU KEC. SIAK KECIL |
174.828.011 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 51 |
2024 |
NORMALISASI PARIT AZIZ DUSUN MUDA JAYA RT 3 RW 2 DESA LUBUK MUDA KECAMATAN SIAK KECIL |
174.844.708 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 52 |
2024 |
PEMBANGUNAN TURAP BETON JALAN SOEKARNO HATTA SELAT BARU MENUJU SEI. LIONG |
547.180.396 |
SELESAI |
2024-05-06 |
2024-10-02 |
| 53 |
2024 |
NORMALISASI PARIT PERKEBUNAN JLN.MUFAKAT DUSUN 3 DESA SARI TANJUNG KEC.RUPAT KAB.BENGKALIS |
199.730.845 |
SELESAI |
2024-09-11 |
2024-11-09 |
| 54 |
2024 |
PEMBANGUNAN TURAP JALAN KARANG REJO RW 02 & RW 06 DESA BALAI MAKAM KEC. BATHIN SOLAPAN KAB. BENGKALIS |
99.624.301 |
SELESAI |
2024-10-23 |
2024-12-21 |
| 55 |
2024 |
NORMALISASI PARIT JL. H. IKHSAN DESA TELUK KAPAL KEC.BANTAN |
194.449.985 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 56 |
2024 |
NORMALISASI ANAK SUNGAI MUNTAI RT.01 KE TR.02 RW.01 DUSUN MEKAR SARI DESA MUNTAI KEC. BANTAN |
194.573.889 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 57 |
2024 |
PEMBANGUNAN PARIT BETON JALAN ANTARA UJUNG RT 3 RW 5 ( SAMPING AYAM POTONG KENJI ) DESA WONOSARI KEC. BENGKALIS KAB. BENGKALIS |
198.891.493 |
SELESAI |
2024-11-07 |
2024-12-21 |
| 58 |
2024 |
NORMALISASI SUNGAI MUNTAI RW.01 DUSUN MEKAR SARI KE RW 03 DUSUN TUA DESA MUNTAI KEC. BANTAN |
194.338.486 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 59 |
2024 |
PENGAWASAN PEMBANGUNAN SISTEM DRAINASE LINGKUNGAN KEC. BENGKALIS |
598.456.500 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 60 |
2024 |
NORMALISASI PARIT JALAN POROS DESA ULU PULAU MEJUNU DESA PENEBAL |
199.758.480 |
SELESAI |
2024-09-13 |
2024-11-11 |
| 61 |
2024 |
SURAT PERJANJIAN PELAKSANAAN PEMBANGUNAN TURAP JALAN HIKMAH KELURAHAN TERKUL |
339.126.555 |
SELESAI |
2024-05-03 |
2024-08-30 |
| 62 |
2024 |
NORMALISASI PARIT JLN. DINAMIT DESA TASIK SERAI KEC. TALANG MUANDAU KAB. BENGKALIS |
199.780.142 |
SELESAI |
2024-09-13 |
2024-11-11 |
| 63 |
2024 |
NORMALISASI PARIT JL.POROS TANJUNG KAPAL MENUJU PELABUHAN RORO |
194.658.738 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 64 |
2024 |
NORMALISASI PARIT RT 5 RW 2 DUSUN RUKUN DESA PANGKALAN JAMBI KEC. BUKIT BATU |
174.867.605 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 65 |
2024 |
PEMBANGUNAN LANJUTAN TURAP BETON JL. RAJIMUN RT.004 RW.003 DUSUN KAMPUNH TENGAN DRSA PASIRAN KECAMATAN BANTAN KABUPATEN BENGKALIS |
194.714.259 |
SELESAI |
2024-09-11 |
2024-12-09 |
| 66 |
2024 |
PERENCANAAN PEMBANGUNAN BANGUNAN PERKUATAN TEBING KECAMATAN SIAK KECIL |
49.894.500 |
SELESAI |
2024-04-04 |
2024-05-03 |
| 67 |
2024 |
PERENCANAAN NORMALISASI KECAMATAN RUPAT |
64.879.500 |
SELESAI |
2024-10-01 |
2024-10-30 |
| 68 |
2024 |
PENGAWASAN PEMBANGUNAN PINTU AIR/BENDUNGAN PENGENDALI BANJIR |
19.514.900 |
SELESAI |
2024-09-13 |
2024-12-11 |
| 69 |
2024 |
NORMALISASI JL. AIR PUTIH - SELATBARU DRSA AIR PUTIH |
199.690.344 |
SELESAI |
2024-09-13 |
2024-11-11 |
| 70 |
2024 |
NORMALISASI PARIT JL. TANJUNG PARIT DESA PAMBANG BARU |
199.724.854 |
SELESAI |
2024-09-13 |
2024-11-11 |
| 71 |
2024 |
NORMALISASI TALI AIR JL. PADANG PERMAI RT 01/ RW 03 DUSUN II DESA MENTAYAN |
199.705.878 |
SELESAI |
2024-09-13 |
2024-12-11 |
| 72 |
2024 |
NORMALISASI PARIT JL. SEPAKAT DUSUN SUNGAI BANGKUANG RT.11 RW.6 DESA LUBUK MUDA KEC. SIAK KECIL |
194.695.378 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 73 |
2024 |
NORMALISASI TALI AIR JALAN ROSYID RT 04 RW 02 DUSUN MANGKU JAYA DESA MUARA DUA KEC.SIAK KECIL |
199.806.653 |
SELESAI |
2024-09-11 |
2024-12-09 |
| 74 |
2024 |
NORMALISASI PARIT JL. JAYA PURNA SIWAR DESA ULU PULAU KEC.BANTAN |
194.586.716 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 75 |
2024 |
NORMALISASI PARIT DUSUN SENA RT 07 RW 08 DESA SUNGAI LINAU KEC.SIAK KECIL |
174.828.356 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 76 |
2024 |
NPEMBANGUNAN TURAP JL. ABDUL RAHMAN 1 RT/RW 002/001 DUSUN 1 DESA PANCUR JAYA KEC. RUPAT KAB. BENGKALIS |
149.621.803 |
SELESAI |
2024-09-11 |
2025-12-09 |
| 77 |
2024 |
NORMALISASI PARIT SIMPANG AMRIL DUSUN MUDA JAYA RT.04 RW.02 DESA LUBUK MUDA KEC. SIAK KECIL |
194.733.688 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 78 |
2024 |
NORMALISASI PARIT RT 01 RW 05 KELURAHAN BATANG SEROSA KAN. BENGKALIS |
199.818.512 |
SELESAI |
2024-11-29 |
2024-12-20 |
| 79 |
2024 |
NORMALISASI PATIR JL, LINTAS RUPAT KEL.PERGAM KEC. RUPAT |
194.767.377 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 80 |
2024 |
NORMALISASI PARIT JL. LINTAS RUPAT DESA SUKARJO MESIM KEC. RUPAT |
194.768.901 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 81 |
2024 |
NORMALISASI PARIT JL. GHOZALI MENUJU SUNGAI JANGKANG DESA BANTAN TUA |
194.304.701 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 82 |
2024 |
NORMALISASI SUNGAI DUSUN CEMPEDAK RT 007 / RW 004 DESA LUBUK GAUNG KEC. SUAK KECIL KAB BENGKALIS |
199.796.439 |
SELESAI |
2024-09-13 |
2024-11-11 |
| 83 |
2024 |
NORMALISASI TALI AIR PATIR BAGONG DUSUN AIR MASUK RT 15 RW 08 DESA BANDAR JAYA KECAMATAN SIAK KECIL |
199.699.839 |
SELESAI |
2024-09-11 |
2024-11-09 |
| 84 |
2024 |
NORMALISASI PARIT JL BEMBANGUNAN RT 01 RW 03 DUSUN KEMBAR DESA PAMBANG PESISIR KECAMATAN BANTAN |
194.750.000 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 85 |
2024 |
NORMALISASI PARIT JL. SATRIA DUSUN KARYA INDAH DESA ULU PULAU KEC.BANTAN |
194.500.149 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 86 |
2024 |
PEMBANGUNAN TURAP BETON JALAN ABDUL AZIZ RT.005 RW.003 DESA TANJUNG MEDANG |
290.651.224 |
SELESAI |
2024-05-03 |
2024-08-30 |
| 87 |
2024 |
NORMALISASI PATIR JL GARUDA TR 03 RW 05 DUSUN PERMAI DESA PAMBANG PESISIR KEC. BANTAN |
194.575.000 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 88 |
2024 |
NORMALISASI PARIT JALAN PELABUHAN RORO BWNGKALIS AIR PUTIH KECAMATAN BENGKALIS |
194.799.680 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 89 |
2024 |
NORMALISASI PRIT JALAN MASJID DUSUN 1 RT.003/RW.004 DESA KETAM PUTIH |
194.919.102 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 90 |
2024 |
PEMBANGUNAN TURAP RT 14 RW 007 DUSUN TELUK GELAM DESA TANJUNG DATUK KEC. SIAK KECIL KAB. BENGKALIS |
149.792.719 |
SELESAI |
2024-09-13 |
2024-12-11 |
| 91 |
2024 |
NORMALISASI KANAN JL. SAWIT BERKAH RW 12 DESA PETANI KEC. BATHIN SOLAPAN |
194.783.255 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 92 |
2024 |
REHABILITAS RUANG AULA GEDUNG INSTANSI VERTIKAL JL. BANTAN DESA SENGGORO (MAKODIM 0303 BENGKALIS) |
199.800.000 |
SELESAI |
2024-11-19 |
2024-12-18 |
| 93 |
2024 |
REHABILITAS MESJID AGUNG ISTIQOMAH BENGKALIS |
990.045.207.391 |
SELESAI |
2024-06-24 |
2024-12-20 |
| 94 |
2024 |
PERENCANAAN SARANA DAN PRASARANA WISATA KABUPATEN BENGKALIS KEC. BANTAN |
99.722.400 |
SELESAI |
2024-11-11 |
2024-12-10 |
| 95 |
2024 |
PERENCANAAN REHABILITASI GEDUNG PEMERINTAH JL. ANTARA (BAWASLU) |
74.823.990 |
SELESAI |
2024-10-09 |
2024-11-07 |
| 96 |
2024 |
PERENCANAAN PERLUASAN JARINGAN PERPIPAAN SPAM IKK MANDAU |
99.777.900 |
|
2024-10-09 |
2024-11-07 |
| 97 |
2024 |
FEASIBILITY STUDY TPA/TPST KEC. RUPAT |
497.934.900 |
SELESAI |
2024-09-12 |
2024-12-27 |
| 98 |
2024 |
PENYUSUNAN DOKUMEN JUKNIS HIBAH SPAM PERDESAAN |
99.855.600 |
SELESAI |
2024-11-18 |
2024-12-17 |
| 99 |
2024 |
PENGAWASAN REHABILITAS MESJID AGUNG ISTIQOMAH BENGKALIS |
299.511.300 |
SELESAI |
2024-07-24 |
2024-12-20 |
| 100 |
2024 |
PENGAWASAN PERLUASAN JARINGAN PERPIPAAN SPAM IKK MANDAU |
99.777.900 |
SELESAI |
2024-11-18 |
2024-12-29 |
| 101 |
2024 |
PENGAWASAN PENINGKATAN SARANA PENUNJANG ASTAKA MTQ TINGKAT PROV. RIAU DI KAB. BENGKALIS |
99.800.100 |
SELESAI |
2024-05-09 |
2024-07-07 |
| 102 |
2024 |
PENGAWASAN PEMBANGUNAN GEDUNG AUDITORIUM STIE SYARIAH BENGKALIS (TAHAP II) |
99.700.200 |
SELESAI |
2024-04-19 |
2024-09-15 |
| 103 |
2024 |
PENGAWASAN LANJUTAN PENINGKATAN SEKRETARIAT PWI KABUPATEN BENGKALIS |
59.859.600 |
SELESAI |
2024-07-16 |
2024-09-13 |
| 104 |
2024 |
PENGAWASAN LANJUTAN PENINGKATAN SARANA DAN PRASARANA GEDUNG PEMERINTAH JL. PERTANIAN KECAMATAN BENGKALIS |
99.841.170 |
SELESAI |
2024-04-22 |
2024-08-19 |
| 105 |
2024 |
PENGAWASAN LANJUTAN PENINGKATAN SARANA DAN PRASARANA GEDUNG KANTOR ISNTANSI PEMERINTAH JL. PERTANIAN TAHAP IV (LAPAS KELAS II-B BENGKALIS) |
99.807.870 |
SELESAI |
2024-04-22 |
2024-08-19 |
| 106 |
2024 |
PENGAWASAN LANJUTAN PEMBANGUNAN MESJID STAIN BENGKALIS |
99.547.020 |
SELESAI |
2024-04-19 |
2024-10-15 |
| 107 |
2024 |
PEMBANGUNAN GEDUNG AUDITORIUM STIE SYARIAH BENGKALIS (TAHAP II) |
5.843.646.378 |
SELESAI |
2024-04-19 |
2024-09-15 |
| 108 |
2024 |
LANJUTAN PENINGKATAN SARANA DAN PRASARANA GEDUNG PEMERINTAH JL.PERTANIAN KECAMATAN BENGKALIS |
2.909.421.000 |
SELESAI |
2024-04-22 |
2024-08-19 |
| 109 |
2024 |
LANJUTAN PENINGKATAN SARANA DAN PRASARANA GEDUNG INSTANSI PEMERINTAHAN JL.PERTANIAN TAHAP IV (POLRES BENGKALIS) |
1.462.062.799 |
SELESAI |
2024-08-27 |
2024-12-23 |
| 110 |
2024 |
LANJUTAN PEMBANGUNAN MESJID STAIN BENGKALIS |
3.891.864.340 |
SELESAI |
2024-04-19 |
2024-10-15 |
| 111 |
2024 |
LANJUTAN LANJUTAN PENINGKATAN SARANA DAN PRASARANA GEDUNG KANTOR INSTANSI PEMERINTAH JL.PERTANIAN TAHAP IV (LAPAS KELAS II-B BENGKALIS) |
2.909.731.603 |
SELESAI |
2024-04-22 |
2024-08-19 |
| 112 |
2024 |
NORMALISASI PARIT JL. POROS PANCUR MENUJU DESA PARIT KEBUMEN KEC.RUPAT |
194.732.314 |
SELESAI |
2024-11-05 |
2024-12-19 |
| 113 |
2024 |
FEASIBILITY STUDY TPA/TPST KEC SIAK KECIL |
497.524.200 |
SELESAI |
2024-09-12 |
2024-12-27 |
| 114 |
2024 |
PENGAWASAN PEMBANGUNAN JEMBATAN KECAMATAN BATHIN SOLAPAN, KECAMATAN BUKIT BATU DAN KECAMATAN SIAK KECIL |
148.601.294 |
SELESAI |
2024-07-31 |
2024-11-27 |
| 115 |
2024 |
PENGAWASAN PENINGKATAN POROS REGULER KECAMATAN SIAK KECIL A |
258.574.500 |
SELESAI |
2024-06-26 |
2024-10-23 |
| 116 |
2024 |
PERENCANAAN PENINGKATAN JALAN POROS KECAMATAN BENGKALIS DAN KECAMATAN BANTAN |
99.941.070 |
SELESAI |
2024-10-25 |
2024-11-23 |
| 117 |
2024 |
PENINGKATAN JALAN DIPONEGORO DUSUN TANJUNG DESA SEKODI |
929.600.778 |
SELESAI |
2024-11-20 |
2024-12-19 |
| 118 |
2024 |
PENGAWASAN PENINGKATAN JALAN POROS STRATEGIS KECAMATAN SIAK KECIL |
199.800.000 |
SELESAI |
2024-05-20 |
2024-10-16 |
| 119 |
2024 |
PENGAWASA PENINGKATAN JALAN PAMBANG TELUK LANCAR (DAK) |
248.862.000 |
SELESAI |
2024-06-14 |
2024-11-10 |
| 120 |
2024 |
PENGAWASAN PENINGKATAN JALAN DIPONEGORO DUSUN TANJUNG DESA SEKODI |
49.922.250 |
SELESAI |
2024-11-20 |
2024-12-19 |
| 121 |
2024 |
PENGAWASAN PEMBANGUNAN JEMBATAN KECAMATAN BANTAN |
29.947.800 |
SELESAI |
2024-11-18 |
2024-12-17 |
| 122 |
2024 |
PEMBANGUNAN JEMBATAN RUAS JALAN BATU PANJANG - TANJUNG KAPAL (PARIT JL. UTAMA) |
1.994.729.427 |
SELESAI |
2024-08-27 |
2024-12-23 |
| 123 |
2024 |
PEMBANGUNAN BOX CULVERT DESA PEMATANG OBO KEC. BATHIN SOLAPAN |
199.850.000 |
SELESAI |
2024-10-17 |
2024-12-15 |
| 124 |
2024 |
PERENCANAAN PEMBANGUNAN JEMBATAN RUAS SELATBARU - DELUK |
99.924.148 |
SELESAI |
2024-10-25 |
2024-11-23 |
| 125 |
2024 |
PENINGKATAN JALAN BUKIT ABBAS KECAMATAN BATHIN SOLAPAN |
1.937.000.000 |
SELESAI |
2024-05-15 |
2024-09-11 |
| 126 |
2024 |
PENINGKATAN JALAN KELAPASARI |
984.872.200 |
SELESAI |
2024-05-29 |
2024-08-26 |
| 127 |
2024 |
PENINGKATAN JALAN KAYU API |
14.623.714.788 |
SELESAI |
2024-06-07 |
2024-12-23 |
| 128 |
2024 |
PENINGKATAN JALAN TELUK KADUR - TANJUNG MEDANG |
2.945.071.464 |
SELESAI |
2024-04-27 |
2024-08-09 |
| 129 |
2024 |
PENINGKATAN JALAN SRI MAKSUM DUSUN TAMAN SARI |
979.718.198 |
SELESAI |
2024-06-28 |
2024-09-25 |
| 130 |
2024 |
PEMBANGUNAN OPRIT JEMBATAN SUNGAI BULUH DESA MUARA DUA |
690.780.000 |
SELESAI |
2024-07-31 |
2024-11-27 |
| 131 |
2024 |
PENINGKATAN JALAN SADAR JAYA MENUJU MUARA DUA (RUAS SADAR JAYA - BANDAR JAYA) |
4.900.280.156 |
SELESAI |
2024-05-20 |
2024-10-16 |
| 132 |
2024 |
PENINGKATAN JALAN KUD -SIMP. TIGA PASAR HARAPAN BARU |
4.940.834.058 |
SELESAI |
2024-05-07 |
2024-10-03 |
| 133 |
2024 |
PENINGKATAN JALAN POROS BULUH APO MENUJU SEI.MERANTI (RUAS JALAN POROS BULUH APO) |
3.921.383.294 |
SELESAI |
2024-05-13 |
2024-10-09 |
| 134 |
2024 |
PENINGKATAN JALAN MUNTAI - BANTAN AIR (RUAS BENGKALIS - MUNTAI) |
9.788.934.600 |
SELESAI |
2024-06-19 |
2024-12-15 |
| 135 |
2024 |
PEMBANGUNAN BOX CULVERT JL.IHSAN DESA BERANCAH |
69.900.000 |
SELESAI |
2024-11-18 |
2024-12-17 |
| 136 |
2024 |
SURVEI KONDISI JALAN DI KABUPATEN BENGKALIS |
797.960.574 |
SELESAI |
2024-08-26 |
2024-12-24 |
| 137 |
2024 |
PERENCANAAN PEMBANGUNAN JEMBATAN RUAS SELATBARU -DELUK |
99.924.148 |
SELESAI |
2024-10-25 |
2024-11-23 |
| 138 |
2024 |
PENGAWASAN PENINGKATAN JALAN POROS REGULER KECAMATAN BANTAN |
49.927.800 |
SELESAI |
2024-05-27 |
2024-09-27 |
| 139 |
2024 |
PENINGKATAN JALAN BUKIT BATU - PELANTAR |
974.498.424 |
SELESAI |
2024-06-10 |
2024-10-07 |
| 140 |
2022 |
PENGADAAN MOTOR GRADER |
2.775.000.000 |
SELESAI |
2022-09-29 |
2022-11-12 |
| 141 |
2022 |
Pengadaan Laptop 6 Unit |
149.650.000 |
Selesai |
2022-05-17 |
2022-05-31 |