| 1 |
2022 |
Pembangunan Sumur Dalam Kamp. Mattoanging Desa Taraweang Kec. Labakkang |
89.810.000 |
SELESAI |
2022-06-22 |
2022-10-19 |
| 2 |
2022 |
Perpipaan Dan Pengembangan Jaringan Jl. Andi Caco, Kel. Jagong |
179.560.000 |
SELESAI |
2022-05-27 |
2022-09-23 |
| 3 |
2022 |
Lanjutan Drainase Jl. Terminal Baru Sambung Jawa |
89.380.000 |
SELESAI |
2022-05-27 |
2022-09-23 |
| 4 |
2022 |
Pembangunan Drainase Kampung Kalibone |
89.380.000 |
SELESAI |
2022-05-30 |
2022-09-26 |
| 5 |
2022 |
Drainase Kamp. Rappokadang Kel. Kalabirang |
179.500.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 6 |
2022 |
Pembangunan Drainase Dan Tutup Drainase Lorong H. Sessu Tumampua |
148.870.000 |
SELESAI |
2022-07-21 |
2022-11-17 |
| 7 |
2022 |
Pembangunan Drainase Andi Caco |
182.200.000 |
SELESAI |
2022-04-28 |
2022-08-25 |
| 8 |
2022 |
Pembangunan Drainase Jalan Dg. Sore Katapang Malewang Timur Kel. Samalewa Bungoro |
149.620.000 |
SELESAI |
2022-06-09 |
2022-10-06 |
| 9 |
2022 |
Pembangunan Drainase Kompleks Rph (Rumah Potong Hewan) Kec. Pangkajene |
88.680.000 |
SELESAI |
2022-06-02 |
2022-09-29 |
| 10 |
2022 |
Drainase Jalan Matahari Dalam Kelurahan Pa'Doang-Doangan |
133.580.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 11 |
2022 |
Pembangunan Drainase Jalan Matahari Lorong 3 |
88.340.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 12 |
2022 |
Drainase Kamp. Baru-Baru Utara Rk 1 Kel. Bontoperak Kec. Pangkajene |
148.170.000 |
SELESAI |
2022-05-25 |
2022-09-21 |
| 13 |
2022 |
Drainase Kel. Mappasaile Jl.Ketimun |
179.820.000 |
SELESAI |
2022-07-11 |
2022-11-07 |
| 14 |
2022 |
Lanjutan Drainase Kamp Balanakang Jagong |
89.810.000 |
SELESAI |
2022-06-02 |
2022-09-29 |
| 15 |
2022 |
Pembangunan Drainase Di Kamp. Lokkasaile Di Kel. Mappasaile (Sebelah Barat Pasar Palampang) Tembus Sungai Pasar Pangkajene) |
89.770.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 16 |
2022 |
Pembangunan Drainase Kamp. Marangancang Lompo Desa Tamarupa Kec. Mandalle |
134.800.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 17 |
2022 |
Drainase Kamp. Kebun Jeruk Desa Mandalle |
89.980.000 |
SELESAI |
2022-06-20 |
2022-10-17 |
| 18 |
2022 |
Pembangunan Drainase Depan Paud Beringin Kamp. Jatie Desa Kassiloe |
74.840.000 |
SELESAI |
2022-06-10 |
2022-10-07 |
| 19 |
2022 |
Drainase Kamp Bontoe Desa Pitue |
149.110.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 20 |
2022 |
Drainase Kamp Cempae Segeri |
149.400.000 |
SELESAI |
2022-05-25 |
2022-09-21 |
| 21 |
2022 |
Pembangunan Drainase Kel. Bawasalo |
149.240.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 22 |
2022 |
Lanjutan Drainase Kamp. Ce'Lae Rw 4 Dammanggala Kel. Balleangin Kec. Balocci |
89.800.000 |
SELESAI |
2022-06-07 |
2022-10-04 |
| 23 |
2022 |
Drainase Di Kamp. Siang Kel. Boriappaka Kec. Bungoro |
149.570.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 24 |
2022 |
Lanjutan Drainase Desa Bowong Cindea, Kec. Bungoro |
179.420.000 |
SELESAI |
2022-05-25 |
2022-09-21 |
| 25 |
2022 |
Lanjutan Drainase Kamp. Mattoanging Kel. Talaka |
99.110.000 |
SELESAI |
2022-06-07 |
2022-10-04 |
| 26 |
2022 |
Pembangunan Drainase Jl. Sumpang Bita, Balocci Baru |
199.700.000 |
SELESAI |
2022-04-27 |
2022-08-24 |
| 27 |
2022 |
Pembangunan Drainase Sisi Kiri Jalan Poros Dermaga Kp. Pundata Baji |
189.500.000 |
SELESAI |
2022-04-28 |
2022-08-25 |
| 28 |
2022 |
Pembangunan Drainase Kp. Sekoa, Desa Bonto Manai |
179.300.000 |
SELESAI |
2022-08-23 |
2022-11-20 |
| 29 |
2022 |
Lanjutan Paving Blok Jalan Setapak Kamp.Bontolali Desa Manakku |
49.800.000 |
SELESAI |
2022-06-07 |
2022-10-04 |
| 30 |
2022 |
Lanjutan Paving Blok Desa Kassiloe Kec. Labakkang |
89.590.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 31 |
2022 |
Paving Blok Jalan Kamp. Soreang Desa Kabba |
89.600.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 32 |
2022 |
Paving Blok Jl. Sambung Jawa |
178.600.000 |
SELESAI |
2022-05-27 |
2022-09-23 |
| 33 |
2022 |
Lanjutan Jalan Setapak Kamp. Alosie Desa Kanaungan |
89.940.000 |
SELESAI |
2022-07-01 |
2022-10-28 |
| 34 |
2022 |
Lanjutan Jalan Setapak Kamp. Alosie Desa Kanaungan |
89.940.000 |
SELESAI |
2022-07-01 |
2022-10-28 |
| 35 |
2022 |
Pembangunan Jalan Setapak Kamp. Moncongbori |
149.820.000 |
SELESAI |
2022-04-28 |
2022-08-25 |
| 36 |
2022 |
Lanjutan Jalan Setapak Kelurahan Bonto Perak |
89.750.000 |
SELESAI |
2022-04-28 |
2022-08-25 |
| 37 |
2022 |
Lanjutan Jalan Setapak Kp Parang-Parang Pundata Baji |
199.570.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 38 |
2022 |
Paving Blok Jalan Samping Tahu Sumedang, Desa Gentung Kec. Labakkang |
89.650.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 39 |
2022 |
Paving Blok Jl. Leang Kassi Kamp. Bonto Manai Lorong 2 Kecamatan Minasate'Ne |
148.600.000 |
SELESAI |
2022-06-03 |
2022-09-30 |
| 40 |
2022 |
Jalan Setapak Kamp Lempangan Kel. Tumampua |
89.820.000 |
SELESAI |
2022-06-22 |
2022-10-19 |
| 41 |
2022 |
Pemasangan Paving Blok (Jln Andi Caco Kel. Tumampua Kec. Pangkajene |
89.490.000 |
SELESAI |
2022-06-08 |
2022-10-05 |
| 42 |
2022 |
Jalan Setapak Mauraga, Samping Sman 1 Pangkep, Kelurahan Jagong |
134.610.000 |
SELESAI |
2022-06-10 |
2022-10-07 |
| 43 |
2022 |
Jalan Setapak Tala-Tala Kelurahan Bontokio |
134.370.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 44 |
2022 |
Lanjutan Jalan Setapak Kamp. Tumampua Malise Mallekana |
74.580.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 45 |
2022 |
Pembangunan Jalan Setapak Kamp. Jollo Desa Bulucendea Kec. Bungoro |
89.490.000 |
SELESAI |
2022-06-09 |
2022-10-06 |
| 46 |
2022 |
Paving Blok Jalan Setapak Kamp. Bontonompo |
74.700.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 47 |
2022 |
Jalan Setapak Pakkasalo Kel. Mappasaile Kec. Pangkajene |
89.870.000 |
SELESAI |
2022-08-15 |
2022-11-12 |
| 48 |
2022 |
Lanjutan Paving Blok Jalan Depan Rujab Camat Liukang Tangayya Pulau Sapuka Kec. Liukang Tangayya |
179.680.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 49 |
2022 |
Lanjutan jalan tengah paving blok pulau sapuka |
179.380.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 50 |
2022 |
Pekerjaan Paving Blok Pulau Pelokan Desa Balo-Baloang |
89.790.000 |
SELESAI |
2022-06-28 |
2022-10-25 |
| 51 |
2022 |
Paving Blok Depan Ulp |
89.100.000 |
SELESAI |
2022-06-02 |
2022-09-29 |
| 52 |
2022 |
Jalan Setapak Kalu-Kalukuang Kalmas Segmen 2 |
179.100.000 |
SELESAI |
2022-05-25 |
2022-09-21 |
| 53 |
2022 |
Lanjutan Pembangunan Jalan Setapak Kp.Padeng Kel. Sibatua Dan Kp. Sanrangan Kel. Bonto Perak |
59.940.000 |
SELESAI |
2022-05-27 |
2022-09-23 |
| 54 |
2022 |
Paving Blok Dari Dermaga Ke Kantor Kec. Tangaya |
179.950.000 |
SELESAI |
2022-06-28 |
2022-10-25 |
| 55 |
2022 |
Paving Blok Dari Dermaga Ke Kantor Kec. Kalmas |
179.680.000 |
SELESAI |
2022-06-24 |
2022-10-21 |
| 56 |
2022 |
Lanjutan Jalan Setapak Pulau Satanger |
179.520.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 57 |
2022 |
Pembangunan Jalan Setapak Jalan Matahari Lorong 3 |
199.570.000 |
SELESAI |
2022-06-10 |
2022-10-07 |
| 58 |
2022 |
Pembuatan Jalan Setapak Kamp Likoboddong Anrong Appaka |
134.660.000 |
SELESAI |
2022-04-28 |
2022-08-25 |
| 59 |
2022 |
Pembuatan Jalan Setapak A. Caco |
199.470.000 |
SELESAI |
2022-04-27 |
2022-08-24 |
| 60 |
2022 |
Lanjutan Jalan Setapak Pulau Tinggalungan |
179.550.000 |
SELESAI |
2022-05-24 |
2022-09-20 |
| 61 |
2022 |
Jalan Setapak Kalu-Kalukuang Kalmas Segmen I |
148.770.000 |
SELESAI |
2022-05-25 |
2022-09-21 |
| 62 |
2022 |
Lanjutan Jalan Setapak Pulau Sapuka |
149.760.000 |
SELESAI |
2022-04-28 |
2022-08-25 |
| 63 |
2022 |
Jalan Setapak Pamantauang |
149.800.000 |
SELESAI |
2022-07-12 |
2022-11-08 |
| 64 |
2022 |
Perencanaan Pemeliharan Kantor DPMPTSP |
34.650.000 |
SELESAI |
2022-02-25 |
2022-03-26 |
| 65 |
2022 |
Perencanaan Pemeliharan Bangunan I |
88.679.250 |
SELESAI |
2022-02-25 |
2022-03-26 |
| 66 |
2022 |
Lanjutan Rehab Kantor Polres Pangkep (Hibah) |
149.700.000 |
STATUS |
2022-07-19 |
2022-11-15 |
| 67 |
2022 |
Rehab Total Rumah Jabatan Polres Pangkep |
901.009.076 |
SELESAI |
2022-04-25 |
2022-08-23 |
| 68 |
2022 |
Lanjutan Rehab Rujab DPRD |
189.400.000 |
SELESAI |
2022-06-20 |
2022-10-16 |
| 69 |
2022 |
Lanjutan Pemb. Pelataran dan Tempat Wudhu DPRD |
199.620.000 |
SELESAI |
2022-04-27 |
2022-09-05 |
| 70 |
2022 |
Lanjutan Pemb. Mushollah DPRD |
199.100.000 |
SELESAI |
2022-04-27 |
2022-09-05 |
| 71 |
2022 |
Lanjutan Jalan bonto Panno-pamukka, Depan ktr desa tondong kura |
188.665.000 |
Selesai |
2022-06-07 |
- |
| 72 |
2022 |
lanjutan bontopenno dengeng tondongkura |
149.369.000 |
Selesai |
2022-05-30 |
- |
| 73 |
2022 |
Lanjutan Jl. Kp. Peseng Desa Benteng |
189.176.000 |
Selesai |
2022-05-18 |
- |
| 74 |
2022 |
Pembangunan Jalan Kp. lerang-lerang Gentung |
189.114.000 |
Selesai |
2022-07-08 |
- |
| 75 |
2022 |
Lanjutan Jl. bulutanae Desa Barabatu |
189.209.000 |
Selesai |
2022-06-28 |
- |
| 76 |
2022 |
Lanjutan Jl. bulutanae Desa Barabatu |
189.209.000 |
Selesai |
2022-06-28 |
- |
| 77 |
2022 |
Pembangunan Jalan Kp. Tarusan |
149.325.000 |
Selesai |
2022-06-28 |
- |
| 78 |
2022 |
Pembangunan Jalan Kp. Bontonompo Borimasunggu |
149.260.000 |
Selesai |
2022-06-07 |
- |
| 79 |
2022 |
Lanjutan Jl. Kp. Pakkang Kel. Bawasalo |
189.149.000 |
Selesai |
2022-07-08 |
- |
| 80 |
2022 |
Perintisan Jalan Pallenge Marang |
188.920.000 |
Selesai |
2022-05-30 |
- |
| 81 |
2022 |
Perencanaan Teknis Pengendali Banjir |
29.837.500 |
SELESAI |
2022-03-01 |
2022-03-30 |
| 82 |
2022 |
Perencanaan Teknis Pembangunan Penahan Abrasi |
49.247.000 |
SELESAI |
2022-03-01 |
2022-03-30 |
| 83 |
2022 |
Perencanaan Teknis Pembangunan Turap/Talud/Bronjong dan Saluran Irigasi |
49.593.500 |
SELESAI |
2022-03-01 |
2022-03-30 |
| 84 |
2022 |
Perencanaan Teknis Pembangunan Turap/Talud/Bronjong dan Saluran Irigasi |
49.593.500 |
SELESAI |
2022-03-01 |
2022-03-30 |
| 85 |
2022 |
Normalisasi Saluran Kamp. Bu'nea Kel. Kalabbirang |
134.079.000 |
SELESAI |
2022-08-16 |
2022-11-13 |
| 86 |
2022 |
Normalisasi Saluran Pembuang Sapanjang Desa Kanaungan |
128.673.000 |
SELESAI |
2022-07-14 |
2022-11-11 |
| 87 |
2022 |
Normalisasi Saluran Allolempong |
79.007.000 |
SELESAI |
2022-07-14 |
2022-11-11 |
| 88 |
2022 |
Pembangunan Tanggul Pengaman Abrasi Pulau Dewakang Caddi |
98.887.000 |
SELESAI |
2022-07-14 |
2022-11-11 |
| 89 |
2022 |
Pembangunan Tanggul Pengaman Abrasi Pulau Kulambing |
173.845.000 |
SELESAI |
2022-07-19 |
2022-11-16 |
| 90 |
2022 |
Lanjutan Pembangunan Talud Sungai Pekka Salo Kel. Mappasaile |
89.126.000 |
SELESAI |
2022-06-28 |
2022-10-31 |
| 91 |
2022 |
Pembuatan Talud Lompo Tiu RW 5 Ce'lae Kel. Balleangin Kec. Balocci |
148.469.000 |
SELESAI |
2022-06-28 |
2022-10-31 |
| 92 |
2022 |
Pembangunan Talud/Bronjong Saluran Pembuangan Air Kamp. Bontomagape Kel. Tumampua |
123.838.000 |
SELESAI |
2022-07-15 |
2022-11-12 |
| 93 |
2022 |
Lanjutan Pembangunan Talud Sungai Pasui |
178.603.000 |
SELESAI |
2022-06-28 |
2022-10-31 |
| 94 |
2022 |
Lanjutan Pembangunan Talud/Bronjong Kamp. Katojoa Kel. Pundata Baji Kec. Labakkang |
133.809.000 |
SELESAI |
2022-07-19 |
2022-11-16 |
| 95 |
2022 |
Pembangunan Talud/Bronjong Sungai Jennae Desa Pitue Ma'rang |
178.734.000 |
SELESAI |
2022-07-14 |
2022-11-11 |
| 96 |
2022 |
Pembangunan Talud/Bronjong Sepe'e |
178.643.000 |
SELESAI |
2022-06-28 |
2022-10-31 |
| 97 |
2022 |
Perbaikan Irigasi Lampu Tiuk Kel. Balleangin Kec. Balocci dan Perbaikan Pintu Air |
90.057.000 |
SELESAI |
2022-06-28 |
2022-10-31 |