1 |
2021 |
Penguatan Data Base dan Survey Kondisi Jembatan |
426.406.750 |
|
2021-07-26 |
2021-11-30 |
2 |
2022 |
Peningkatan Jalan Gg. Etam Desa, Desa Sekerat Kec. Bengalon |
119.244.000 |
|
2022-08-24 |
2022-10-08 |
3 |
2022 |
Peningkatan Jalan Gg. Zam-Zam, Desa Sekrat Kec Bengalon |
79.250.000 |
|
2022-08-25 |
2022-10-09 |
4 |
2022 |
Peningkatan Jalan Meranti, Desa Swarga Bara Kec. Sangatta Utara |
476.946.000 |
|
2022-08-11 |
2022-12-09 |
5 |
2022 |
Peningkatan Jalan Sumber Makmur, Desa Sepaso Barat, Kec. Bengalon |
169.875.000 |
|
2022-08-24 |
2022-10-08 |
6 |
2022 |
Pengawasan Teknis dan Review Design Peningkatan Jalan Bina Marga I |
189.561.000 |
|
2022-09-05 |
2022-12-31 |
7 |
2022 |
Rehabilitasi Jalan Desa Keraitan, Kec. Bengalon |
179.831.000 |
|
2022-08-25 |
2022-10-09 |
8 |
2022 |
Rehabilitasi Jalan Merbabu Kec. Kaliorang |
179.831.000 |
|
2022-08-25 |
2022-10-09 |
9 |
2022 |
Rehabilitasi Jalan Poros Desa Kaliorang Kec. Kaliorang |
179.602.000 |
|
2022-08-26 |
2022-10-10 |
10 |
2022 |
Rehabilitasi Jalan Poros Desa Tebangan Lembak Kec. Bengalon |
179.604.000 |
|
2022-08-25 |
2022-10-09 |
11 |
2022 |
Rehabilitasi Jalan Sepaso Selatan, Kec. Bengalon |
179.602.000 |
|
2022-08-25 |
2022-10-09 |
12 |
2022 |
Pengawasan Teknis dan Review Design Rehabilitasi Jalan Bina Marga 1 dan Pembangunan Jembatan Bina Marga 1 |
99.705.000 |
|
2022-08-24 |
2022-11-07 |
13 |
2022 |
Peningkatan Jalan Simpang 4 Kaliorang - Simpang 3 Bangun Jaya Kecamatan Kaliorang |
3.160.387.000 |
|
2022-08-30 |
2022-11-28 |
14 |
2022 |
Pengawasan Teknis dan Review Design Peningkatan Jalan Simpang 4 Kaliorang - Simpang 3 Bangun Jaya Kecamatan Kaliorang |
99.949.000 |
|
2022-08-31 |
2022-11-29 |
15 |
2022 |
Peningkatan Jalan Poros Desa Selangkau |
17.506.004.000 |
|
2022-05-31 |
2022-12-27 |
16 |
2022 |
Pengawas Teknis dan Review Design Peningkatan Jalan Poros Desa Selangkau |
404.263.000 |
|
2022-05-18 |
2022-12-14 |
17 |
2022 |
Peningkatan Jalan Poros Ke Desa Himba Lestari |
4.722.176.000 |
|
2022-05-31 |
2022-11-27 |
18 |
2022 |
Pengawas Teknis dan Review Design Peningkatan Jalan Poros Ke Desa Himba Lestari |
322.078.000 |
|
2022-05-18 |
2022-11-14 |
19 |
2022 |
Peningkatan Jalan Poros Desa Long Poq - Long Tesak Kec. Muara Ancalong |
602.980.000 |
|
2022-07-26 |
2022-11-23 |
20 |
2022 |
Peningkatan Jalan Gang Bangeris Kec. Sangatta Utara |
175.146.000 |
|
2022-09-01 |
2022-11-30 |
21 |
2022 |
Peningkatan Jalan Kec. Sangatta Selatan |
175.744.000 |
|
2022-08-23 |
2022-11-21 |
22 |
2022 |
Peningkatan Jalan Mugi Rahayu - Batu Redi Kec. Batu Ampar |
176.022.000 |
|
2022-09-01 |
2022-11-30 |
23 |
2022 |
Peningkatan Jalan Pinang Dalam Kec Sangatta Utara |
175.147.000 |
|
2022-09-05 |
2022-12-04 |
24 |
2022 |
Peningkatan Jalan/Turap Danau Batur, Kecamatan Kongbeng |
146.481.000 |
|
2022-08-24 |
2022-11-22 |
25 |
2022 |
Pengawasan Teknis dan Review Design Peningkatan Jalan Bina Marga 2 |
96.903.000 |
|
2022-08-31 |
2022-12-29 |
26 |
2022 |
Rehabilitasi Jalan Haji Masdar Ring Road |
186.261.000 |
|
2022-08-18 |
2022-11-16 |
27 |
2022 |
Rehabilitasi Jalan Desa Sepat Sepaso Induk Bengalon |
186.185.000 |
|
2022-08-20 |
2022-11-18 |
28 |
2022 |
Rehabilitasi Jalan Ring Road I Sangatta Selatan |
186.261.000 |
|
2022-08-19 |
2022-11-17 |
29 |
2022 |
Rehabilitasi Jalan Poros Desa Tanjung Labu (Jalan Sawit) Rantau Pulung |
187.257.000 |
|
2022-08-22 |
2022-11-20 |
30 |
2022 |
Pengawasan Teknis dan Review Design Rehabilitasi Jalan Bina Marga 2 |
49.728.000 |
|
2022-09-01 |
2022-11-30 |
31 |
2022 |
Peningkatan Jalan Poros Desa Himba Lestari - Rantau Pulung |
6.959.943.000 |
|
2022-05-24 |
2022-12-20 |
32 |
2022 |
Pengawas Teknis dan Review Design Peningkatan Jalan Poros Desa Himba Lestari - Rantau Pulung |
330.797.000 |
|
2022-05-18 |
2022-12-14 |
33 |
2022 |
Rehabilitasi Jalan Simpang 4 Belidan Menuju Kampung Desa Marukangan Kec. Sandaran |
1.157.943.000 |
|
2022-08-26 |
2022-12-24 |
34 |
2022 |
Pengawasan Teknis dan Review Design Rehabilitasi Jalan Simpang 4 Belidan Menuju Kampung Desa Marukangan Kec. Sandaran |
183.194.000 |
|
2022-08-26 |
2022-12-24 |
35 |
2022 |
Pembangunan Box Culvert Desa Perupuk Kec. Sangkulirang |
800.935.000 |
|
2022-08-22 |
2022-12-20 |
36 |
2022 |
Pengawasan Teknis dan Review Design Pembangunan Box Culvert Desa Perupuk Kec. Sangkulirang |
98.889.000 |
|
2022-08-22 |
2022-12-20 |
37 |
2022 |
Rehabilitasi Jalan SP.3-SP.6 Kec. Rantau Pulung |
473.998.000 |
|
2022-08-26 |
2022-12-24 |
38 |
2022 |
Normalisasi Anak Sungai RT. 04 Dusun Danau Raya Desa Sangatta Selatan |
168.193.000 |
Selesai |
2022-09-02 |
2022-10-23 |
39 |
2022 |
Normalisasi Sungai Pasir Desa Bangun Jaya Kec. Kaliorang |
167.999.000 |
Selesai |
2022-08-22 |
2022-10-12 |
40 |
2022 |
Normalisasi Sungai Anak Dusun Raya Desa Sangatta Selatan Kec. Sangatta Selatan |
168.921.000 |
Selesai |
2022-08-22 |
2022-10-12 |
41 |
2022 |
Pembangunan Drainase RT.01 s/d RT.19 Desa Tepian Baru Kec. Bengalon |
129.600.000 |
baru mulai |
2022-09-21 |
2022-11-11 |
42 |
2022 |
Pembangunan Bendung Dusun Ngelin, Kelurahan Melan Kec. Long Mesangat |
79.823.000 |
baru mulai |
2022-09-23 |
2022-10-22 |
43 |
2022 |
Pembangunan Pagar Bendung Desa Mugi Rahayu Kec. Batu Ampar |
114.380.000 |
baru mulai |
2022-09-22 |
2022-10-21 |