1 |
2022 |
Pembangunan Bangunan Perkuatan Tebing Paket 2 |
194.790.484.000 |
Selesai |
2022-05-10 |
2022-06-08 |
2 |
2022 |
Pembangunan Bangunan Perkuatan Tebing Paket 3 |
192.778.147 |
Selesai |
2022-05-12 |
2022-06-10 |
3 |
2022 |
Rehabilisasi Check Dam Paket 2 |
196.959.410.093 |
Selesai |
2022-06-21 |
2022-07-20 |
4 |
2022 |
Normalisasi Sungai Paket 2 |
193.825.355 |
Selesai |
2022-07-11 |
2022-08-09 |
5 |
2022 |
Normalisasi Sungai Paket 3 |
190.372.101 |
Selesai |
2022-05-12 |
2022-06-10 |
6 |
2022 |
Normalisasi Sungai Paket 4 |
148.455.347 |
Selesai |
2022-11-21 |
2022-12-20 |
7 |
2022 |
Peningkatan Saluran Irigasi Paket 4 |
189.507.329 |
Selesai |
2022-09-12 |
2022-09-12 |
8 |
2022 |
Peningkatan Saluran Irigasi Paket 5 |
188.585.303 |
Selesai |
2022-04-28 |
2022-05-27 |
9 |
2022 |
Peningkatan Saluran Irigasi Paket 6 |
193.952.963 |
Selesai |
2022-06-24 |
2022-07-23 |
10 |
2022 |
Peningkatan Saluran Irigasi Paket 7 |
189.096.781 |
Selesai |
2022-06-07 |
2022-07-06 |
11 |
2022 |
Rehabilisasi Jaringan Irigasi Paket 2 |
197.505.104 |
Selesai |
2022-09-28 |
2022-10-27 |
12 |
2022 |
Pembangunan Saluran Drainase Paket 6 |
197.798.576 |
Selesai |
2022-03-30 |
2022-04-28 |
13 |
2022 |
Pembangunan Saluran Drainase Paket 7 |
194.900.912 |
Selesai |
2022-03-29 |
2022-04-27 |
14 |
2022 |
Pembangunan Saluran Drainase Paket 8 |
189.082.151 |
Selesai |
2022-04-11 |
2022-05-10 |
15 |
2022 |
Pembangunan Saluran Drainase Paket 9 |
187.262.020 |
Selesai |
2022-06-07 |
2022-07-06 |
16 |
2022 |
Pembangunan Bangunan Perkuatan Tebing Paket 1 |
470.587.025 |
selesai |
2023-01-10 |
2022-12-23 |
17 |
2022 |
Peningkatan Saluran Irigasi Paket 1 |
506.758.149 |
selesai |
2022-09-15 |
2022-11-28 |
18 |
2022 |
Peningkatan Saluran Irigasi Paket 3 |
499.396.401 |
selesai |
2022-09-16 |
2022-11-29 |
19 |
2022 |
Rehabilitasi Jaringan irigasi Paket 1 |
399.907.849 |
selesai |
2022-10-04 |
2022-12-02 |
20 |
2022 |
Pembangunan Saluran Drainase Paket 1 |
1.480.400.000 |
selesai |
2022-09-07 |
2022-12-24 |
21 |
2022 |
Pembangunan Saluran Drainase Paket 3 |
707.884.210 |
selesai |
2022-09-14 |
2022-12-12 |
22 |
2022 |
Pembangunan Saluran Drainase Paket 4 |
326.069.282 |
selesai |
2022-10-03 |
2022-12-01 |
23 |
2022 |
Pembangunan Saluran Drainase Paket 5 |
1.356.294.256 |
selesai |
2022-09-13 |
2022-12-24 |
24 |
2022 |
Peningkatan Saluran Drainase Paket 2 |
340.307.181 |
selesai |
2022-09-14 |
2022-11-12 |
25 |
2022 |
Peningkatan Saluran Drainase Paket 3 |
1.063.241.731 |
selesai |
2022-09-28 |
2022-12-24 |
26 |
2022 |
Peningkatan Saluran Drainase Paket 4 |
864.360.610 |
selesai |
2022-09-30 |
2022-12-24 |
27 |
2022 |
Peningkatan Saluran Drainase Paket 5 |
731.000.000 |
selesai |
2022-09-19 |
2022-12-17 |
28 |
2022 |
Peningkatan Saluran Drainase Paket 7 |
352.758.855 |
selesai |
2022-09-23 |
2022-11-21 |
29 |
2022 |
Rehabilitasi Saluran Drainase Paket 2 |
695.069.305 |
selesai |
2022-09-23 |
2022-12-21 |
30 |
2022 |
Rehabilitasi Saluran Drainase Paket 3 |
637.954.052 |
selesai |
2022-09-29 |
2022-12-27 |
31 |
2022 |
Rehabilitasi Saluran Drainase Paket 4 |
479.555.233 |
selesai |
2022-09-19 |
2022-12-02 |
32 |
2022 |
Rehabilitasi Saluran Drainase Paket 5 |
399.000.000 |
selesai |
2022-09-16 |
2022-11-14 |
33 |
2022 |
Rehabilitasi Saluran Drainase Paket 6 |
762.216.158 |
selesai |
2022-09-14 |
2022-12-12 |
34 |
2022 |
Rehabilitasi Saluran Drainase Paket 9 |
520.839.878 |
selesai |
2022-10-03 |
2022-12-16 |
35 |
2022 |
Lanjutan Pembangunan Gedung Kantor Camat Padang Barat. |
2.369.000.000 |
selesai |
2022-08-30 |
2022-11-08 |
36 |
2022 |
Rehab Berat/Sedang Kantor Balaikota |
1.952.984.554 |
selesai |
2022-05-31 |
2022-09-27 |
37 |
2022 |
Penataan Kawasan Wisata Gunung Padang |
1.347.389.691 |
selesai |
2022-06-06 |
2022-10-03 |
38 |
2022 |
Penataan Pemakaman Bungus Teluk Kabung |
691.840.726 |
selesai |
2022-08-22 |
2022-12-19 |
39 |
2022 |
Pengaspalan Jalan Paket 2 |
4.510.050.990 |
selesai |
2022-09-22 |
2022-12-20 |
40 |
2022 |
Peningkatan Jalan |
2.621.654.640 |
selesai |
2022-06-16 |
2022-10-13 |
41 |
2022 |
Rehabilitasi Jalan Paket 1 |
4.398.797.514 |
selesai |
2022-09-16 |
2022-12-29 |
42 |
2022 |
Rehabilitasi Jalan Paket 2 |
1.986.510.777 |
selesai |
2022-06-16 |
2022-09-13 |
43 |
2022 |
Rehabilitasi Jalan Paket 3 |
2.409.221.193 |
selesai |
2022-08-01 |
2022-11-13 |
44 |
2022 |
Rehabilitasi Jalan Paket 4 |
2.092.665.015 |
selesai |
2022-06-16 |
2022-09-13 |
45 |
2022 |
Pembangunan Saluran Drainase Paket 10 |
18.601.255.400 |
Selesai |
2022-03-30 |
2022-04-28 |
46 |
2022 |
Pembangunan Saluran Drainase Paket 11 |
18.504.740.241 |
Selesai |
2022-06-06 |
2022-07-05 |
47 |
2022 |
Pembangunan Saluran Drainase Paket 12 |
18.454.218.693 |
Selesai |
2022-06-06 |
2022-07-05 |
48 |
2022 |
Pemeliharaan Berkala Jalan / Rehabilitasi Jalan Paket 1 |
2.215.391.273 |
selesai |
2022-06-22 |
2022-09-19 |
49 |
2022 |
Pemeliharaan Berkala Jalan / Rehabilitasi Jalan Paket 2 |
1.642.689.206 |
selesai |
2022-06-13 |
2022-09-10 |
50 |
2022 |
Pemeliharaan Berkala Jalan / Rehabilitasi Jalan Paket 3 |
2.640.060.842 |
selesai |
2022-07-07 |
2022-10-04 |
51 |
2022 |
Pembangunan Jembatan Paket 2 |
2.322.394.722 |
selesai |
2022-08-02 |
2022-12-29 |
52 |
2022 |
Penggantian Jembatan Paket 1 |
3.580.917.190 |
selesai |
2022-08-04 |
2022-12-31 |
53 |
2022 |
Penggantian Jembatan Paket 2 |
6.154.243.916 |
selesai |
2022-06-15 |
2022-12-26 |
54 |
2022 |
Konsultan Supervisi Pengaspalan Jalan Paket 2 |
193.228.800 |
selesai |
2022-09-20 |
2022-12-22 |
55 |
2022 |
Konsultan Supervisi Peningkatan Jalan |
184.420.950 |
selesai |
2022-06-16 |
2022-10-13 |
56 |
2022 |
Konsultan Supervisi Rehabilitasi Jalan Paket 1 |
183.736.080 |
selesai |
2022-09-16 |
2022-12-29 |
57 |
2022 |
Konsultan Supervisi Rehabilitasi Jalan Paket 2 |
145.171.350 |
selesai |
2022-06-16 |
2022-09-13 |
58 |
2022 |
Konsultan Supervisi Rehabilitasi Jalan Paket 3 |
176.952.870 |
selesai |
2022-08-01 |
2022-11-13 |
59 |
2022 |
Konsultan Supervisi Rehabilitasi Jalan Paket 4 |
145.343.400 |
selesai |
2022-06-16 |
2022-09-13 |
60 |
2022 |
Jasa Konsultansi Pengawasan Pemeliharaan Berkala Jalan / Rehabilitasi Jalan Paket 1 |
155.205.750 |
selesai |
2022-06-22 |
2022-09-19 |
61 |
2022 |
Jasa Konsultansi Pengawasan Pemeliharaan Berkala Jalan / Rehabilitasi Jalan Paket 2 |
136.197.000 |
selesai |
2022-06-13 |
2022-09-10 |
62 |
2022 |
Jasa Konsultansi Pengawasan Pemeliharaan Berkala Jalan / Rehabilitasi Jalan Paket 3 |
161.327.400 |
selesai |
2022-07-07 |
2022-10-04 |
63 |
2022 |
Konsultan Supervisi Pembangunan Jembatan Paket 2 |
215.883.900 |
selesai |
2022-08-02 |
2022-12-29 |
64 |
2022 |
Konsultan Supervisi Penggantian Jembatan Paket 1 |
209.473.650 |
selesai |
2022-08-04 |
2022-12-31 |
65 |
2022 |
Konsultan Supervisi Penggantian Jembatan Paket 2 |
323.875.800 |
selesai |
2022-06-15 |
2022-12-26 |
66 |
2022 |
Jasa Konsultasi Legalisasi Peraturan Kepala Daerah (Perkada) Rencana Detail Tata Ruang (RDTR) Kota Padang |
466.323.673 |
selesai |
2022-03-22 |
2022-06-04 |
67 |
2022 |
Peningkatan Saluran Drainase Paket 8 |
195.730.894 |
Selesai |
2022-04-11 |
2022-05-10 |
68 |
2022 |
Peningkatan Saluran Drainase Paket 9 |
194.779.503 |
Selesai |
2022-04-05 |
2022-05-04 |
69 |
2022 |
Peningkatan Saluran Drainase Paket 10 |
192.398.239 |
Selesai |
2022-04-11 |
2022-05-10 |
70 |
2022 |
Peningkatan Saluran Drainase Paket 10 |
192.398.239 |
Selesai |
2022-04-11 |
2022-05-10 |
71 |
2022 |
Peningkatan Saluran Drainase Paket 11 |
192.398.239 |
Selesai |
2022-04-11 |
2022-05-10 |
72 |
2022 |
Peningkatan Saluran Drainase Paket 12 |
189.948.201 |
Selesai |
2022-05-11 |
2022-06-09 |
73 |
2022 |
Peningkatan Saluran Drainase Paket 12 |
189.948.201 |
Selesai |
2022-05-11 |
2022-06-09 |
74 |
2022 |
Peningkatan Saluran Drainase Paket 13 |
189.323.347 |
Selesai |
2022-04-19 |
2022-05-18 |
75 |
2022 |
Peningkatan Saluran Drainase Paket 13 |
189.323.347 |
Selesai |
2022-04-19 |
2022-05-18 |
76 |
2022 |
Peningkatan Saluran Drainase Paket 14 |
187.770.478 |
Selesai |
2022-07-13 |
2022-08-11 |
77 |
2022 |
Peningkatan Saluran Drainase Paket 15 |
186.479.519 |
Selesai |
2022-07-04 |
2022-08-02 |
78 |
2022 |
Peningkatan Saluran Drainase Paket 16 |
184.022.512 |
Selesai |
2022-07-04 |
2022-08-02 |
79 |
2022 |
Peningkatan Saluran Drainase Paket 17 |
182.573.676 |
Selesai |
2022-05-16 |
2022-06-14 |
80 |
2022 |
Rehabilitasi Saluran Drainase Paket 11 |
195.952.956 |
Selesai |
2022-04-11 |
2022-05-10 |
81 |
2022 |
Rehabilitasi Saluran Drainase Paket 12 |
194.119.624 |
Selesai |
2022-04-13 |
2022-05-12 |
82 |
2022 |
Rehabilitasi Saluran Drainase Paket 13 |
193.334.582 |
Selesai |
2022-05-30 |
2022-06-28 |
83 |
2022 |
Rehabilitasi Saluran Drainase Paket 14 |
190.787.065 |
Selesai |
2022-07-11 |
2022-08-09 |
84 |
2022 |
Supervisi Pembangunan/Peningkatan/Perluasan/Perbaikan SPAM Paket 4 |
18.481.500 |
selesai |
2022-07-04 |
2022-08-02 |
85 |
2022 |
Konsultansi Supervisi Penataan Pemakaman Bungus Teluk Kabung |
70.479.450 |
selesai |
2022-08-22 |
2022-09-19 |
86 |
2022 |
Rehabilitasi Saluran Drainase Paket 15 |
190.361.870 |
Selesai |
2022-07-06 |
2022-08-04 |
87 |
2022 |
Supervisi Pananaman Rumput Balaikota |
18.498.150 |
selesai |
2022-11-18 |
2022-12-02 |
88 |
2022 |
Supervisi Pemasangan Paving Block Kantor Balaikota |
18.503.700 |
selesai |
2022-11-18 |
2022-12-02 |
89 |
2022 |
Supervisi Pembangunan Jogging Track Kantor Balaikota |
18.509.250 |
selesai |
2022-11-18 |
2022-12-02 |
90 |
2022 |
Rehabilitasi Saluran Drainase Paket 16 |
188.773.051 |
Selesai |
2022-07-13 |
2022-08-11 |
91 |
2022 |
Supervisi Lanjutan Pembangunan Gedung Kantor Camat Padang Barat. |
96.836.400 |
selesai |
2022-08-30 |
2022-11-08 |
92 |
2022 |
Supervisi Rehab Berat/Sedang Kantor Balaikota |
99.516.217 |
selesai |
2022-05-31 |
2022-09-27 |
93 |
2022 |
Rehabilitasi Saluran Drainase Paket 14 |
185.382.777 |
Selesai |
2022-10-10 |
2022-08-11 |
94 |
2022 |
Supervisi Pengecatan Kawasan Kota Tua Padang |
18.470.400 |
selesai |
2022-11-14 |
2022-11-28 |
95 |
2022 |
Supervisi Rehab Berat/Sedang Bangunan Kodim |
18.530.000 |
selesai |
2022-12-02 |
2022-12-16 |
96 |
2022 |
Konsultansi Supervisi Penataan Kawasan Wisata Gunung Padang |
99.218.737 |
selesai |
2022-06-06 |
2022-10-03 |
97 |
2022 |
Perencanaan Sungai Paket 1 |
94.660.800 |
selesai |
2022-09-12 |
2022-10-26 |
98 |
2022 |
Belanja Jasa Konsultansi Berorientasi Layanan-Jasa Studi Penelitian dan Bantuan Teknik (Epaksi Paket 1) |
99.467.100 |
selesai |
2022-11-16 |
2022-12-15 |
99 |
2022 |
Belanja Jasa Konsultansi Berorientasi Layanan-Jasa Studi Penelitian dan Bantuan Teknik (Epaksi Paket 2) |
99.422.700 |
selesai |
2022-11-16 |
2022-12-15 |
100 |
2022 |
Rehabilitasi Saluran Drainase Paket 17 |
185.382.777 |
Selesai |
2022-10-10 |
2022-11-08 |
101 |
2022 |
Perencanaan Drainase Paket 1 |
97.310.059 |
selesai |
2022-04-11 |
2022-05-10 |
102 |
2022 |
Perencanaan Drainase Paket 2 |
97.174.950 |
selesai |
2022-10-05 |
2022-11-18 |
103 |
2022 |
Rehabilitasi Saluran Drainase Paket 18 |
186.821.163 |
Selesai |
2022-06-15 |
2022-07-14 |
104 |
2022 |
Perencanaan Drainase Paket 3 |
97.322.580 |
selesai |
2022-10-05 |
2022-11-18 |
105 |
2022 |
Perencanaan Drainase Paket 4 |
97.355.325 |
selesai |
2022-10-05 |
2022-11-18 |
106 |
2022 |
Perencanaan Drainase Paket 5 |
94.698.540 |
selesai |
2022-10-05 |
2022-11-18 |
107 |
2022 |
Perencanaan Penataan Bangunan dan Lingkungan Paket 1 |
97.222.818 |
selesai |
2022-10-06 |
2022-11-04 |
108 |
2022 |
Perencanaan Penataan Bangunan dan Lingkungan Paket 2 |
94.786.368 |
selesai |
2022-09-05 |
2022-10-04 |
109 |
2022 |
Perencanaan Penataan Bangunan dan Lingkungan Paket 3 |
94.723.842 |
selesai |
2022-11-25 |
2022-12-23 |
110 |
2022 |
Perencanaan Jembatan Paket 1 |
94.338.750 |
selesai |
2022-02-21 |
2022-03-22 |
111 |
2022 |
Perencanaan Jembatan Paket 2 |
94.633.050 |
selesai |
2022-09-12 |
2022-10-26 |
112 |
2022 |
Rehabilitasi Saluran Drainase Paket 19 |
182.108.822 |
Selesai |
2022-06-01 |
2022-06-30 |
113 |
2022 |
Perencanaan Jembatan Paket 3 |
94.757.925 |
selesai |
2022-11-10 |
2022-12-09 |
114 |
2022 |
Perencanaan Jembatan Paket 4 |
94.746.825 |
selesai |
2022-11-10 |
2022-12-09 |
115 |
2022 |
Perencanaan Trotoar Paket 1 |
96.514.500 |
selesai |
2022-09-06 |
2022-10-20 |
116 |
2022 |
Perencanaan Trotoar Paket 2 |
97.058.400 |
selesai |
2022-09-06 |
2022-10-20 |
117 |
2022 |
Pembangunan SPAM Jaringan Perpipaan di Kawasan Perkotaan Paket 1 |
179.775.000 |
Selesai |
2022-07-04 |
2022-08-02 |
118 |
2022 |
Perencanaan Jalan Paket 1 |
94.470.750 |
selesai |
2022-02-21 |
2022-03-22 |
119 |
2022 |
Perencanaan Jalan Paket 2 |
94.699.650 |
selesai |
2022-09-05 |
2022-10-19 |
120 |
2022 |
Pembangunan SPAM Jaringan Perpipaan di Kawasan Perkotaan Paket 2 |
179.633.000 |
Selesai |
2022-07-04 |
2022-08-02 |
121 |
2022 |
Perencanaan Jalan Paket 3 |
94.727.400 |
selesai |
2022-09-05 |
2022-10-19 |
122 |
2022 |
Pembangunan SPAM Jaringan Perpipaan di Kawasan Perkotaan Paket 3 |
179.500.000 |
Selesai |
2022-07-04 |
2022-08-02 |
123 |
2022 |
Perencanaan Jalan Paket 4 |
94.644.150 |
selesai |
2022-09-12 |
2022-10-26 |
124 |
2022 |
Perencanaan Jalan Paket 5 |
91.969.050 |
selesai |
2022-09-12 |
2022-10-26 |
125 |
2022 |
Pembangunan SPAM Jaringan Perpipaan di Kawasan Perkotaan Paket 4 |
179.761.000 |
Selesai |
2022-07-04 |
2022-08-02 |
126 |
2022 |
Perencanaan Jalan Paket 6 |
83.691.225 |
selesai |
2022-11-09 |
2022-12-08 |
127 |
2022 |
Pananaman Rumput Balaikota |
196.203.000 |
Selesai |
2022-11-18 |
2022-12-02 |
128 |
2022 |
Jasa Konsultan Perencanaan Rehabilitasi Gedung Pemerintah |
97.549.425 |
selesai |
2022-04-28 |
2022-05-25 |
129 |
2022 |
Survey Kondisi Jalan Paket 1 |
99.539.250 |
selesai |
2022-11-23 |
2022-11-23 |
130 |
2022 |
Pemasangan Paving Block Kantor Balaikota |
197.650.000 |
Selesai |
2022-11-18 |
2022-12-12 |
131 |
2022 |
Survey Kondisi Jalan Paket 2 |
99.456.000 |
selesai |
2022-11-23 |
2022-12-23 |
132 |
2022 |
Survey Kondisi Jalan Paket 3 |
99.567.000 |
selesai |
2022-11-23 |
2022-12-23 |
133 |
2022 |
Survey Kondisi Jembatan Paket 1 |
99.444.900 |
selesai |
2022-11-22 |
2022-12-22 |
134 |
2022 |
CV. HUMAIRAH ENGINEERING CONSULTANT |
99.467.100 |
selesai |
2022-11-22 |
2022-12-22 |
135 |
2022 |
Pembangunan Jogging Track Kantor Balaikota |
198.430.000 |
Selesai |
2022-11-18 |
2022-12-02 |
136 |
2022 |
Perencanaan Rehab Berat/Sedang Bangunan Kodim |
31.527.330 |
selesai |
2022-11-10 |
2022-11-23 |
137 |
2022 |
Pengecatan Kawasan Kota Tua Padang |
198.401.588 |
Selesai |
2022-11-14 |
2022-11-28 |
138 |
2022 |
Rehab Berat/Sedang Bangunan Kodim |
189.354.000 |
Selesai |
2022-12-02 |
2022-12-16 |
139 |
2022 |
Rehabilitasi Jalan Paket 5 |
199.097.873 |
Selesai |
2022-03-31 |
2022-04-05 |
140 |
2022 |
Rehabilitasi Jalan Paket 6 |
196.013.843 |
Selesai |
2022-04-04 |
2022-05-04 |
141 |
2022 |
Rehabilitasi Jalan Paket 7 |
198.584.473 |
Selesai |
2022-04-22 |
2022-05-21 |
142 |
2022 |
Rehabilitasi Jalan Paket 8 |
199.246.345 |
Selesai |
2022-05-09 |
2022-06-08 |
143 |
2022 |
Rehabilitasi Jalan Paket 9 |
198.040.666 |
Selesai |
2022-04-21 |
2022-05-20 |
144 |
2022 |
Rehabilitasi Jalan Paket 10 |
198.023.143 |
Selesai |
2022-05-09 |
2022-06-08 |
145 |
2022 |
Rehabilitasi Jalan Paket 11 |
199.263.974 |
Selesai |
2022-05-09 |
2022-06-08 |
146 |
2022 |
Rehabilitasi Jalan Paket 12 |
194.221.323 |
Selesai |
2022-06-28 |
2022-07-27 |
147 |
2022 |
Rehabilitasi Jalan Paket 13 |
199.379.198 |
Selesai |
2022-06-29 |
2022-07-28 |
148 |
2022 |
Rehabilitasi Jalan Paket 14 |
199.429.082 |
Selesai |
2022-11-25 |
2022-12-29 |
149 |
2022 |
Pembangunan Jembatan Paket 3 |
198.780.691 |
Selesai |
2022-07-14 |
2022-08-12 |
150 |
2022 |
Pembangunan Jembatan Paket 4 |
198.370.069 |
Selesai |
2022-11-10 |
2022-12-15 |
151 |
2022 |
Penggantian Jembatan Paket 3 |
199.278.478 |
Selesai |
2022-08-05 |
2022-12-13 |
152 |
2022 |
Pengawasan Pembangunan Bangunan Perkuatan Tebing Paket 1 |
51.175.162 |
Selesai |
2022-10-10 |
2022-12-23 |
153 |
2022 |
Pengawasan Peningkatan Saluran Irigasi Paket 1 |
50.616.000 |
Selesai |
2022-09-15 |
2022-11-28 |
154 |
2022 |
Pengawasan Peningkatan Saluran Irigasi Paket 3 |
50.505.000 |
Selesai |
2022-09-16 |
2022-11-29 |
155 |
2022 |
Pengawasan Peningkatan Saluran Irigasi Paket 3 |
51.203.745 |
Selesai |
2022-10-04 |
2022-12-02 |
156 |
2022 |
Pengawasan Pembangunan Saluran Drainase Paket 1 |
99.345.000 |
Selesai |
2022-09-07 |
2022-12-24 |
157 |
2022 |
Pengawasan Pembangunan Saluran Drainase Paket 3 |
72.150.000 |
Selesai |
2022-09-14 |
2022-12-12 |
158 |
2022 |
Pengawasan Pembangunan Saluran Drainase Paket 3 |
44.000.000 |
Selesai |
2022-10-03 |
2022-12-01 |
159 |
2022 |
Pengawasan Pembangunan Sistem Drainase Paket 5 |
99.513.720 |
Selesai |
2022-09-13 |
2022-12-24 |
160 |
2022 |
Pengawasan Peningkatan Saluran Drainase Paket 2 |
43.845.000 |
Selesai |
2022-09-14 |
2022-11-12 |
161 |
2022 |
Pengawasan Peningkatan Saluran Drainase Paket 3 |
93.612.183 |
Selesai |
2022-09-28 |
2022-12-24 |
162 |
2022 |
Pengawasan Pembangunan Saluran Drainase Paket 3 |
72.150.000 |
Selesai |
2022-09-14 |
2022-12-12 |
163 |
2022 |
Pengawasan Pembangunan Saluran Drainase Paket 3 |
44.000.000 |
Selesai |
2022-10-03 |
2022-12-01 |
164 |
2022 |
Pengawasan Pembangunan Sistem Drainase Paket 5 |
99.513.720 |
Selesai |
2022-09-13 |
2022-12-24 |
165 |
2022 |
Pengawasan Peningkatan Saluran Drainase Paket 2 |
43.845.000 |
Selesai |
2022-09-14 |
2022-11-12 |
166 |
2022 |
Pengawasan Peningkatan Saluran Drainase Paket 3 |
93.612.183 |
Selesai |
2022-09-28 |
2022-12-24 |
167 |
2022 |
Pengawasan Peningkatan Saluran Drainase Paket 4 |
93.516.084 |
Selesai |
2022-09-30 |
2022-12-24 |
168 |
2022 |
Pengawasan Peningkatan Saluran Drainase Paket 5 |
72.520.185 |
Selesai |
2022-09-19 |
2022-12-17 |
169 |
2022 |
Pengawasan Peningkatan Saluran Drainase Paket 7 |
43.911.572 |
Selesai |
2022-09-23 |
2022-11-21 |
170 |
2022 |
Pengawasan Rehabilitasi Saluran Drainase Paket 2 |
72.419.096 |
Selesai |
2022-09-23 |
2022-12-21 |
171 |
2022 |
Pengawasan Rehabilitasi Saluran Drainase Paket 3 |
72.392.535 |
Selesai |
2022-09-29 |
2022-12-27 |
172 |
2022 |
Pengawasan Rehabilitasi Saluran Drainase Paket 4 |
51.175.995 |
Selesai |
2022-09-19 |
2022-12-02 |
173 |
2022 |
Pengawasan Rehabilitasi Saluran Drainase Paket 5 |
44.023.776 |
Selesai |
2022-09-16 |
2022-11-14 |
174 |
2022 |
Pengawasan Rehabilitasi Saluran Drainase Paket 6 |
72.275.900 |
Selesai |
2022-09-14 |
2022-12-12 |
175 |
2022 |
Supervisi Pembangunan/Peningkatan/Perluasan/Perbaikan SPAM Paket 1 |
18.524.790 |
Selesai |
2022-07-04 |
2022-08-02 |
176 |
2022 |
Supervisi Pembangunan/Peningkatan/Perluasan/Perbaikan SPAM Paket 2 |
18.481.500 |
Selesai |
2022-07-04 |
2022-08-02 |
177 |
2022 |
Supervisi Pembangunan/Peningkatan/Perluasan/Perbaikan SPAM Paket 3 |
18.481.500 |
Selesai |
2022-07-04 |
2022-08-02 |
178 |
2022 |
Supervisi Pembangunan/Peningkatan/Perluasan/Perbaikan SPAM Paket 3 |
18.481.500 |
Selesai |
2022-07-04 |
2022-08-02 |